https://newsletter.mw.creamermedia.com
Copper|Exploration|Gold|Infrastructure|Mining|PROJECT|Proximity|Resources|Storage|Sustainable|Underground|Drilling|Infrastructure|Operations
Copper|Exploration|Gold|Infrastructure|Mining|PROJECT|Proximity|Resources|Storage|Sustainable|Underground|Drilling|Infrastructure|Operations
copper|exploration|gold|infrastructure|mining|project|proximity|resources|storage|sustainable|underground|drilling|infrastructure|operations

Kanmantoo underground project – Stage 1, Australia – update

longitudinal section exploration targets at the Kanmantoo project

Photo by Hillgrove Resources

23rd June 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Kanmantoo underground project – Stage 1.

Location
Adelaide Hills, South Australia.

Project Owner/s
Hillgrove Resources.

Project Description
A project economic assessment (PEA) has confirmed the project’s “excellent” potential.

In February 2023, an updated PEA concluded that the project could produce 43 500 t of copper and 11 500 oz of gold over an initial 45-month mine plan.

Mining will be focused on two of the nine known mineral lodes on the mining lease that were either drilled or mined as part of the openpit operations.

All infrastructure at the mine, including a 3.6-million-tonne-a-year processing plant and operational tailings storage facility, is already in place.

Hillgrove has reported that drilling over the past three years has successfully increased the mineral resource estimate by 600%, to almost seven-million tonnes, and with an exploration target of a further 10-million to 20-million tonnes at 0.9% to 1.3% copper and 0.1 g/t to 0.3 g/t gold in close proximity to the processing plant, there is a great opportunity to expand the mine life further.

Potential Job Creation
An estimated 130 new jobs will be created as the project ramps up towards full production.

Net Present Value/Internal Rate of Return
The project has an estimated net present value of A$165-million and an internal rate of return of 231%, with a payback of nine months.

Capital Expenditure
An economic assessment published in February 2023 estimated that the project could be brought online at a capital cost of A$25-million.

Planned Start/End Date
First copper concentrate production is expected in the first quarter of 2024.

Latest Developments
Hillgrove Resources has made a positive final investment decision to proceed with the Stage 1 development of the Kanmantoo project.

The project is fully fundedwithout debt, through a$38-million placement and share purchase plan. Hillgrove has said that this funding provides sufficient working capital to reach sustainable copper production in the Stage 1 underground. 

The company is continuing exploration activities to increase mine life and production. It has also entered into key underground mining contracts and has appointed key employees for the underground development.

Ore intersected from the development is being stockpiled. The processing plant and tailings storage facility are already in place and are being prepared for the start of processing.

Key Contracts, Suppliers and Consultants
Pybar (exploration decline).

Contact Details for Project Information
Hillgrove Resources, tel +61 8 7070 1698.

Edited by Creamer Media Reporter

Comments

Showroom

Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 
Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer
Magazine round up | 15 November 2024
Magazine round up | 15 November 2024
15th November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.232 0.371s - 129pq - 2rq
Subscribe Now