https://newsletter.mw.creamermedia.com
Business|Construction|Infrastructure|Resources|transport|Water|Infrastructure
Business|Construction|Infrastructure|Resources|transport|Water|Infrastructure
business|construction|infrastructure|resources|transport|water|infrastructure

Lindian acquires MREC processing facility in Kazakhstan

Monazite concentrate and MREC samples

Monazite concentrate and MREC samples

3rd March 2026

By: Marleny Arnoldi

Senior Deputy Editor Online

     

Font size: - +

ASX-listed Lindian Resources has signed a binding term sheet to secure 51% ownership of the Sareco mixed rare earth carbonite (MREC) processing facility in Kazakhstan.

The MREC facility was previously operated by a joint venture (JV) between Japanese company Sumitomo Corporation and Kazakh national operator Kazatomprom and will now be jointly operated by Lindian (51%) and its in-country joint venture partner RA-Group (49%).

The acquisition will transform Lindian’s business from concentrate production to high-value MREC production, which attracts premium playabilities with significantly enhanced economics.

Access to an existing, operational MREC cracking facility provides Lindian with a capital-efficient pathway into downstream processing, removing the need for hundreds of millions of dollars in investment, associated development risk and multi-year construction and permitting timelines, the company notes.

The Sareco facility is already built, operational and retains its core processing infrastructure, allowing Lindian to advance downstream capability in line with the Kangankunde mine development, in Malawi, with both expected to be producing product this year.

Lindian will transport high-quality feedstock supply from the Kangankunde rare earths mine, which is expected to be fully operational by the fourth quarter of this year, to the facility in Kazakhstan.

The transaction is valued at $15-million, of which most is deferred until the facility reaches commercial production of MREC. Lindian says the capital cost to have built a new processing facility would have been more than $500-million.

“Following completion, the transaction represents a step-change in Lindian’s strategy, securing a fully operational downstream cracking facility at a fraction of the development cost, with minimised development risk thus enabling the company to move beyond concentrate sales into higher-value MREC production.

“This materially enhances Lindian’s ability to capture downstream margins, broaden its customer base and strengthen its negotiating position across offtake, separation and strategic partnership discussions,” Lindian says.

The company points out that 12 500 t/y of monazite concentrate production is expected from Stage 1 development at the Kangankunde mine, which will be processed at Sareco using a conventional sulphuric acid bake, water leach, impurity removal and carbonate precipitation flowsheet. 

Lindian will be the JV manager and the board will comprise of four directors and a Lindian-elected chairperson.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Immersive Technologies
Immersive Technologies

Immersive Technologies is the world's largest, proven and tested supplier of simulator training solutions to the global resources industry.

VISIT SHOWROOM 
AutoX
AutoX

We are dedicated to business excellence and innovation.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Gold and platinum developments make headlines
Gold and platinum developments make headlines
27th February 2026
Magazine round up | 27 February 2026
Magazine round up | 27 February 2026
27th February 2026

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.073 0.168s - 122pq - 2rq
Subscribe Now