https://newsletter.mw.creamermedia.com
Construction|Contractor|Mining|PROJECT|rail
Construction|Contractor|Mining|PROJECT|rail
construction|contractor|mining|project|rail

Longonjo neodymium/praseodymium project, Angola – update

Pansana's Salt End REO separation facility

Longonjo's nitial feedstock will be shipped as a clean, high-purity mixed rare earth sulphate to Pensana’s Saltend rare-earth oxide separation facility, in the UK.

Photo by Pensana

9th February 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Longonjo neodymium/praseodymium project.

Location
Huambo, Angola – 4 km from a modern rail line leading directly into the Port of Lobito in the Atlantic Ocean.

Project Owner/s
Pensana Rare Earths holds an 84% interest in Longonjo through its 84% holding in Angola-registered company Ozango Minerais, which, in turn, owns 100% of the mining licence.

The Angolan government holds a 10% interest and the company’s Angolan partners the remaining 6%.

Project Description
Longonjo is one of the biggest rare earths deposits in the world, with an initial 20-year mine life.

The project has total proven and probable reserves of 30.1-million tonnes grading 0.55% neodymium/praseodymium oxide for 166 000 t neodymium/praseodymium and total rare-earth oxides (TREOs) of 767 000 t.

The mine execution plan is based on a staged development of the mine and processing facilities.

At full production, once the phased development is complete, the Longonjo mine will target production of up to 38 000 t/y of mixed rare-earth double sulphate or mixed rare-earth carbonate (MREC) containing 14 000 t of TREOs and up to 4 400 t of neodymium/praseodymium oxides. This equates to about 5% of the worldwide production of neodymium/praseodymium oxides a year for downstream processing or to be sold on the international market.

Initial feedstock will be shipped as a clean, high-purity mixed rare earth sulphate to Pensana’s Saltend rare-earth oxide separation facility, in the UK.

Potential Job Creation
The mine will employ about 650 people during construction and will create 420 permanent high-value jobs.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
Initial capital costs are estimated at $200-million.

Planned Start/End Date
Longonjo is expected to produce 20 000 t of MREC starting in 2026 and 40 000 t of MREC from 2029 onwards following the planned expansion.

Latest Developments
Pensana’s major potential customers have approved the product qualification specifications for Longonjo’s proposed MREC product.

The Longonjo MREC contains 50% TREOs, of which 24% is neodymium and praseodymium, with minimal impurities, in addition to being radionuclide-free.

Key Contracts, Suppliers and Consultants
ADP (main contractor); and MCC (main construction).

Contact Details for Project Information
Pensana Rare Earths, email admin@pensana.co.uk orir@pensana.co.uk.

Edited by Creamer Media Reporter

Comments

Latest News

An image showing the Kloof gold mine
Sibanye-Stillwater secures six health and safety awards
18th November 2024 By: Tasneem Bulbulia

Showroom

Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 
Klüber Lubrication
Klüber Lubrication

Klüber Lubrication ensures that the world’s essential systems—drive units, machines, and water flow—operate efficiently, sustainably, and reliably...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer
Magazine round up | 15 November 2024
Magazine round up | 15 November 2024
15th November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.107 0.251s - 127pq - 2rq
Subscribe Now