https://newsletter.mw.creamermedia.com

Lord Byron openpit gold project, Australia

Image of hammered gold

Photo by ©Bloomberg

28th November 2025

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Lord Byron openpit gold project.

Location
Within 60 km of the proposed one-million-tonne-a-year processing plant at Laverton, in Western Australia.

Project Owner/s
Emerging gold miner Brightstar Resources.

Project Description
Lord Byron's resource is estimated at 2.2-million tonnes at 1.6 g/t gold for 115 000 oz.

Stage 1 of the project will target a single openpit containing 1.6-million tonnes at 1.4 g/t for about 71 000 oz of gold.

Potential Job Creation
Not disclosed.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
Not stated.

Planned Start/End Date
Brightstar is targeting the start of construction of the Laverton processing plant in the first quarter of 2026, which allows for mining to start at Lord Byron early in the second half of 2026 to stockpile mill feed ahead of commissioning.

Latest Developments
Brightstar received approval from the Australian Department of Mines, Petroleum and Exploration for the mining proposal and mine closure plan for the project within the Laverton Hub in September 2025.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Brightstar Resources, tel +61 8 6146 6268 or info@brightstarresources.com.au.
 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Comments

Showroom

Goodwin Submersible Pumps Africa (Pty) Ltd
Goodwin Submersible Pumps Africa (Pty) Ltd

Goodwin Submersible Pumps Africa is sole distributors for Goodwin electrically driven, submersible, abrasion resistance slurry pumps.

VISIT SHOWROOM 
MBE Minerals SA (Pty) Ltd
MBE Minerals SA (Pty) Ltd

Your global lifecycle technology & service partner for materials & minerals processing equipment for coal, iron ore, copper, manganese & other...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Resources Watch
Resources Watch
26th November 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.134 0.212s - 126pq - 2rq
Subscribe Now