Mining restarts at Capricorn
PERTH (miningweekly.com) – ASX-listed 29Metals has restarted mining activities at the Mammoth and Greenstone deposits, as well as the mineral processing operations at its Capricorn copper project, in Queensland.
The company in early March halted production and all non-essential activity at the copper operation, as road access was lost and heavy rainfall resulted in a substantial increase in the volume of water held on site.
In May, 29Metals unveiled its recovery plan, with Phase 1 to focus on the Mammoth and Greenstone mines, which were operationally ready.
Phase 2 of the restart strategy would focus on the Esperanza South operation, with dewatering and rehabilitation efforts at the mine to be undertaken during Phase 1 to enable full recovery operations during Phase 2.
29Metals was expecting recovery costs to reach between A$30-million and A$38-million between the September quarter and the end of the year, with a further A$17-million to A$20-million of recovery costs planned for the mid-first half of 2024, the company told shareholders.
In terms of production outlook, the company is targeting between 4 000 t and 6 000 t of copper production and between 20 000 oz and 30 000 oz of silver production from Capricorn between the September quarter and the end of 2023, with production reaching between 3 000 t and 4 000 t of copper and between 8 000 oz and 12 000 oz of silver to the midpoint of the first half of 2024.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation