https://newsletter.mw.creamermedia.com
PROJECT|Projects|Drilling
PROJECT|Projects|Drilling
project|projects|drilling

Moab completes validation drilling programme in Tanzania

9th December 2024

By: Sabrina Jardim

Senior Online Writer

     

Font size: - +

Australia-listed Moab Minerals has completed drilling at the Manyoni uranium project, in Tanzania, and the first batch of assay results is expected in late December or early January.

Moab has now completed the Stage 1 validation drill programme, designed to check and verify a statistically valid number of the historical drill results. The programme has involved 105 core holes for a total of 1 608 m on the Manyoni C1 and A projects.

All holes were designed to twin pre-existing drill holes and to check and verify the uranium results in those holes by physical assay of the Moab drill core and downhole gamma spectral logging for equivalent triuranium octoxide.

A second batch of core samples for the remainder of the drill holes is currently being prepared for shipment to the laboratory.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 
Essentra Components
Essentra Components

We are responsible manufacturers of essential components. Manufacturing 80 million parts a week, we have over 1 billion parts in stock.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 07 November 2025
Magazine round up | 07 November 2025
7th November 2025
Resources Watch
Resources Watch
5th November 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.108 0.18s - 127pq - 2rq
Subscribe Now