Mosaic says fertilizer waste facility's water entered Tampa Bay after Hurricane Milton
CHICAGO - Mosaic said on Friday that water supporting the chemical company's storage of a waste byproduct from fertilizer manufacturing in Florida probably made its way into Tampa Bay following a downpour from Hurricane Milton.
The discharge of possibly more than 17 500 gallons from Mosaic's facility in Riverview, a fast-growing Tampa suburb, raised potential environmental concerns.
The industrial byproduct, phosphogypsum, is known to emit radon, a cancer-causing radioactive gas.
Mosaic said a storage system for water around a pile of phosphogypsum became overwhelmed in Riverview. The site received nearly 15 inches of rain during Hurricane Milton less than two weeks after Hurricane Helene, the company said in a statement.
Water quality impacts in Tampa Bay are expected to be "modest," if any, Mosaic said.
The company addressed the overflow issue on Thursday and it was not continuing on Friday, it said in the statement. "We've been in constant communication with regulators who are onsite today."
The affected phosphogypsum pile is closed, meaning the company is not adding new material to it, Mosaic said.
Phosphogypsum contains radium, which decays to form radon gas, the US Environmental Protection Agency said, noting that radium and radon are radioactive and can cause cancer.
The EPA requires that phosphogypsum be managed in engineered piles or stacks to limit public exposure from radon emissions.
The EPA told Reuters the Florida Department of Environmental Protection regulates the design, construction, operation and maintenance of phosphogypsum stack systems and they must continue to comply with all regulatory requirements.
The Florida Department of Environmental Protection had no immediate comment.
Mosaic, which mines phosphate rock in Florida and produces about three-quarters of North America's phosphate fertilizers, said it idled Florida operations in anticipation of Milton.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation