https://newsletter.mw.creamermedia.com

Orom-Cross graphite project, Uganda

Image of graphite from Orom-Cross project

Photo by Blencowe Resources

20th February 2026

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Orom-Cross graphite project.

Location
Uganda.

Project Owner/s
British mineral exploration and development company Blencowe Resources.

Project Description
A definitive feasibility (DFS) has showcased Orom-Cross as a tier-1 graphite project, delivering strong margins from a low capital base, and incorporating a downstream beneficiation facility to produce uncoated spheronised purified graphite product (USPG) in-country. Phase 1 (P1) envisions a smaller-scale, fast-track operation of 20 000 t/y concentrate with micronised products. 

Phase 2 (P2) production will expand the operation to 70 000 t/y of concentrate and 20 000 t/y USPG nearby. The long-term aim is to expand production to 
175 000 t/y of concentrates and 80 000 t/y of purified products. Over the 15-year life-of-mine (LoM), average production will be about 97 000 t/y.

A downstream beneficiation facility will be built near Orom-Cross to upgrade small flake concentrate to 99.95% total graphitic carbon USPG, initially producing up to 20 000 t/y.

This facility will expand in parallel to the scale-up of the mine and will serve as a long-term captive offtaker for Orom-Cross concentrates over the 15-year LoM. This will position Orom-Cross among the few commercial-scale producers of 99.95% USPG outside of China, and the first in Africa.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The DFS states a net present value, at a 10% discount rate, of $1.09-billion and an internal rate of return of 96%.

Capital Expenditure
P1 is estimated at $40-million and P2 at $120-million. Further expansions will be funded entirely from in-house cash flow.

Planned Start/End Date
P1 is targeting first production in the first half of 2027. Within two years of the commission of P1, Blencowe intends to start P2 production.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
CPC Engineering (DFS).

Contact Details for Project Information
Blencowe Resources, tel +44 1624 681 250 or email info@blencoweresourcesplc.com.
 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Projects

Image of graphite from Orom-Cross project
Orom-Cross graphite project, Uganda
Updated 1 hour 47 minutes ago By: Sheila Barradas

Showroom

Rio-Carb
Rio-Carb

Rio Carb is an OEM (Original Equipment Manufacturer) of R-C700 Chromium Carbide (CrC) alloy clad wear plates and pipes used for heavy materials...

VISIT SHOWROOM 
Bell Equipment
Bell Equipment

As one of South Africa's leading manufacturers, Bell Equipment distributes and exports its wide range of heavy equipment globally to mining,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Resources Watch
Resources Watch
18th February 2026

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.117 0.195s - 127pq - 2rq
Subscribe Now