https://newsletter.mw.creamermedia.com
Building|Export|Mining|PROJECT|Resources|Drilling
Building|Export|Mining|PROJECT|Resources|Drilling
building|export|mining|project|resources|drilling

Pilot processing plant and lab, US

Image of rare earths

7th November 2025

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Pilot processing plant and lab.

Location
Adjacent to the Brook Mine and near the iCAM Research Center outside Sheridan, Wyoming, in the US. The Brook mine deposit, located along the north-western margin of the Powder river basin, is geologically unique and enriched with rare earths through secondary mobilisation, making it one of the most promising potential sources for rare earths in the US.

Project Owner/s
Critical minerals producer Ramaco Resources.

Project Description
Ramaco is building a new pilot processing plant and laboratory to advance rare earth and critical minerals development. The pilot facility is expected to focus on processing rare earths and critical materials recently restricted from export by China, underscoring the strategic importance of domestic production. 

Analyses performed to date have indicated that the Brook mine deposit, located along the north-western margin of the Powder river basin, is geologically unique and enriched with rare earths through secondary mobilisation, making it one of the most promising potential sources for rare earths in the US.

The facility is designed to demonstrate the technical and economic feasibility of converting domestic carbonaceous ore into high-purity individual rare-earth oxides, which are essential for US magnet production and other advanced technologies. 

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not confirmed.

Capital Expenditure
Not disclosed.

Planned Start/End Date
Initial mobilisation and site development activities started in October 2025.

Latest Developments
Ramaco continues to advance mining and geological work, including infill and expansion drilling, to refine its resource classification and support future mine planning and processing capabilities.

Key Contracts, Suppliers and Consultants
Not disclosed.

Contact Details for Project Information
Ramaco Resources, tel +1 859 244 7455 or email info@ramacometc.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Comments

Showroom

Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 
CSIR International Convention Centre (CSIR ICC)
CSIR International Convention Centre (CSIR ICC)

CSIR International Convention Centre (CSIR ICC) - the leading conference and events venue in Pretoria/Tshwane.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Resources Watch
Resources Watch
5th November 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.273 0.408s - 128pq - 2rq
Subscribe Now