https://newsletter.mw.creamermedia.com
Power|System
Power|System
power|system

PREPARING FOR WORSE

PREPARING FOR WORSE: It’s important to state upfront that, while extremely depressing, preparing for loadshedding beyond the current eight stages is a responsible thing to do. Any intensification of rotational power cuts beyond Stage 8, possibly to as high as Stage 16, would have devastating consequences for the economy and society. Nevertheless, it is still important that the system operator is equipped for the worst-case scenario, so as to avoid a total blackout, which could leave a city such as Johannesburg (pictured) and the country as a whole without electricity for weeks. Photograph: Bloomberg

Photo by Bloomberg

10th March 2023

By: Creamer Media Reporter

     

Font size: - +

It’s important to state upfront that, while extremely depressing, preparing for loadshedding beyond the current eight stages is a responsible thing to do. Any intensification of rotational power cuts beyond Stage 8, possibly to as high as Stage 16, would have devastating consequences for the economy and society. Nevertheless, it is still important that the system operator is equipped for the worst-case scenario, so as to avoid a total blackout, which could leave a city such as Johannesburg (pictured) and the country as a whole without electricity for weeks. Photograph: Bloomberg

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

ZF Aftermarket
ZF Aftermarket

ZF Aftermarket is the after-sales division of the world-renowned German ZF group, a global leader in mobility technology.

VISIT SHOWROOM 
John Thompson
John Thompson

John Thompson, the leader in energy and environmental solutions through value engineering and innovation, provides the following: design, engineer,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Resources Watch
Resources Watch
18th February 2026

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.107 0.19s - 130pq - 2rq
Subscribe Now