Santo Tomas porphyry copper project, Mexico
Name of the Project
Santo Tomas porphyry copper project.
Location
Sinaloa State, Mexico.
Project Owner/s
Oroco Resource Corporation.
Project Description
Oroco announced a revised preliminary economic assessment (PEA) and mineral resource estimate on the project in August 2024.
The mine production plan contains 825.5-million tonnes of mineralised sulphide material with an average grade of 0.37% copper equivalent and 1.14-million tonnes of waste material (including mineralised oxide), resulting in a strip ratio of 1.38 over the life-of-mine (LoM).
The PEA is based on a staged openpit mine and processing plant achieving 60 000 t/d production in Year 1 and expanding to 120 000 t/d in Year 8 over a 22.6-year LoM. Production is preceded by two years of construction and one concurrent year of prestripping. Total LoM payable copper production is estimated at 4.77-million pounds.
A conventional openpit truck-and-shovel operation with 10 m bench intervals is proposed. Haul trucks will be used for hauling mineralised material to the crushing plant and long-term stockpile facilities, and waste to the waste-rock storage facilities.
The project is amenable to conventional flotation recovery to produce marketable copper and molybdenum concentrates, based on the molybdenum levels observed in the bulk concentrate generated during locked-cycle tests.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The revised preliminary economic assessment estimates a pretax net present value, at an 8% discount rate, of $2.64-billion and an internal rate of return of 30.3%, with a payback of 2.9 years from first concentrate production.
Capital Expenditure
Initial capital costs are estimated at $1.1-billion.
Planned Start/End Date
Yet to be confirmed.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
Ausenco Engineering USA South Inc (PEA) and SRK Consulting – US and Canada (updated mineral resource estimate and geological and geotechnical models).
Contact Details for Project Information
Oroco Resource Corp, tel +1 604 688 6200 or email info@orocoresourcecorp.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation