Simberi expansion project, Papua New Guinea


Photo by St Barbara Limited
Name of the Project
Simberi expansion project.
Location
Northernmost island in the Tabar group of islands in the province of New Ireland, in Papua New Guinea (PNG).
Project Owner/s
Australia-based gold mining company St Barbara Limited.
Project Description
The project aims to expand the current mining and processing facilities to allow for the processing of fresh sulphide ore and the extension of the life-of-mine to 13 years.
The mining rate is set to increase from the current 10-million to 12-million tonnes a year to about 20-million tonnes a year.
Operations will shift from processing easily recoverable oxidised ore, which yields gold doré through the conventional carbon-in-leach (CIL) and electrowinning process, to handling fresh ore.
This will require enhancements to the comminution circuit to handle the harder material, and the addition of a flotation circuit to produce a gold-rich concentrate.
The flotation tailings, which contain nonsulphide material, will continue to be processed through the existing CIL circuit to extract any remaining gold.
Total gold production is estimated at 2.2-million ounces from the 2026 to 2028 financial years, based on proved and probable reserves.
The expansion includes the development of extra power generation facilities and the building of a new wharf capable of handling larger vessels to transport the gold concentrate to external buyers.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
Applying a discount rate of 8%, the project has a net present value of $717-million and an internal rate of return of 63%, with a payback of 3.6 years.
Capital Expenditure
Initial project capital is estimated at $235-million, with pre-expansion growth capital of between $40-million and $60-million to be invested between 2026 and 2027.
This will fund early works, including a camp upgrade, road construction and a reverse osmosis plant.
Planned Start/End Date
A final investment decision is expected in the second quarter of the 2026 financial year or early in the third quarter of the 2026 financial year.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
Pitch Black Group (process plant study); and AMC Consultants (mine planning work supporting the life-of-mine plan and the preparation of the ore reserves).
Contact Details for Project Information
St Barbara Limited (Simberi operations), tel +675 76407031 or email info@stbarbara.com.au.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation