https://newsletter.mw.creamermedia.com
Construction|Crushing|flotation|Gold|Mining|PROJECT|Projects|Waste|Waste
Construction|Crushing|flotation|Gold|Mining|PROJECT|Projects|Waste|Waste
construction|crushing|flotation|gold|mining|project|projects|waste-company|waste

Springpole gold project, Canada – update

Drill core from the Springpole gold project

Photo by First Mining Gold

8th November 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Springpole gold project.

Location
North-western Ontario, in Canada.

Project Owner/s
Gold developer First Mining Gold.

Project Description
The Springpole project is one of the biggest undeveloped openpit gold projects in North America. The project has proven and probable reserves of 3.8-million ounces of gold and 20.5-million ounces of silver.

A prefeasibility study (PFS) has supported the construction of a 30 000 t/d openpit mining operation over an 11.3-year life-of-mine (LoM).

The mine will be developed in phases within the ultimate pit, with a maximum depth of about 350 m.

The deposit is planned to produce 121.6-million tonnes of plant process feed and 287.5-million tonnes of waste (2.36:1 overall strip ratio) over the LoM.

The operation will include a process plant that will, in turn, include crushing, grinding and flotation, with fine grinding of the flotation concentrate and agitated leaching of the flotation concentrate and tails. This will be followed by a carbon-in-pulp recovery process to produce doré bars. The processing plant also features a filtered tailings plant.

Average yearly payable gold production is estimated at 335 000 oz in years 1 to 9 and 287 000 oz over the LoM.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 5% discount rate, of $1.5-billion and an internal rate of return of 36%, with an after-tax payback of 2.4 years.

Capital Expenditure
Initial capital costs are estimated at $718-million.

Planned Start/End Date
Not stated.

Latest Developments
First Nation Mining has entered into a “process agreement” with Cat Lake First Nation and Lac Seul First Nation, which will provide capacity to support the implementation of a community-based Anishinaabe-led impact assessment. 

The agreement represents a significant commitment for First Mining and provides the framework for First Mining, Cat Lake and Lac Seul to have “procedural clarity and meaningful participation” in the review of the project.

Key Contracts, Suppliers and Consultants
AGP Mining Consultants Inc (PFS).

Contact Details for Project Information
First Mining Gold, email info@firstmininggold.com.

 

Edited by Creamer Media Reporter

Comments

Showroom

Hanna Instruments (Pty) Ltd
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 
Universal Storage Systems (SA)
Universal Storage Systems (SA)

South African leader in Steel -Racking, -Shelving, and -Mezzanine flooring. Universal has innovated an approach which encompasses conceptualising,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer
Magazine round up | 15 November 2024
Magazine round up | 15 November 2024
15th November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:1.553 1.695s - 128pq - 2rq
Subscribe Now