https://newsletter.mw.creamermedia.com

Stellar reports higher Tongo Dyke-1 reserves, diamond grade

28th November 2014

By: Leandi Kolver

Creamer Media Deputy Editor

  

Font size: - +

JOHANNESBURG (miningweekly.com) – Aim-listed Stellar Diamonds on Friday announced a 35% increase in the Joint Ore Reserves Committee- (Jorc-) compliant inferred resource for its 100%-owned Tongo kimberlite Dyke-1 project, in Sierra Leone.

The project’s Jorc-compliant inferred resource now stood at 1.45-million carats, with bulk sampling results further having led to a 37% increase in the project’s average diamond grade to 165 carats per hundred tonnes (cpht).

“The combination of high grades and high diamond values make this kimberlite one of the highest-value kimberlites in the world in terms of in situ value of dollar per tonne,” Stellar CE Karl Smithson commented.

The project’s in situ kimberlite value was estimated at between $239/t and $324/t, with an in situ resource value of between $214-million and $290-million.

Smithson noted that further resource potential existed from three parallel kimberlite dykes forming a part of the Tongo dyke swarm, including the 1-km-long Dyke-4, which had previously been bulk sampled and returned a diamond grade estimate of 110 cpht and an estimated average diamond value of $140/ct.

“Consistent with our focused strategy of accelerating our key kimberlite projects through the development pipeline and into production, as evidenced by the recent start of trial mining at our Guinean Baoulé project, a study into surface and underground mine development at Tongo is being finalised.

“In line with this, we are currently recalculating our financial model to reflect the resource upgrade and mine plan,” he said.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

John Thompson
John Thompson

John Thompson, the leader in energy and environmental solutions through value engineering and innovation, provides the following: design, engineer,...

VISIT SHOWROOM 
Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 28 March 2025
Magazine round up | 28 March 2025
28th March 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.251 0.323s - 142pq - 2rq
Subscribe Now