Taseko secures another $100m for Arizona copper mine
Vancouver-based Taseko Mines has received approvals for $100-million in additional financing for the Florence project, which will supply 85-million pounds a year of copper when in full production.
Taurus Mining Royalty Fund will provide a $50-million royalty and Societe Generale approved a $50-million senior secured debt facility.
Upon closing and satisfaction of conditions precedent, the proceeds from these project level financings will be available to fund the construction and development of the commercial production facility at Florence, in Arizona.
“The Taurus royalty and the project loan facility from Societe Generale complement the previously announced commitments from Mitsui and Bank of America. A total of $175-million from these four well-regarded industry participants is a strong endorsement of Florence Copper’s technical merits, attractive economics, and favourable environmental attributes,” said president and CEO Stuart McDonald.
Taseko has recently wrapped up permitting for the copper project and with these new financings set to close in the coming months, the company is preparing to start building the commercial facility at Florence.
The company operated a production test facility at Florence for 18 months, which provided it with an opportunity to test operational controls and strategies that would be applied in future commercial operations.
The project has a net present value of $930-million, an internal rate of return of 47% and a payback period of 2.6 years.
Over its 22-year mine life, Florence will produce 1.5-billion pounds of copper at an operating cost of $1.11/lb of copper.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation