https://newsletter.mw.creamermedia.com
Africa|Design|Fabrication|Financial|Gold|Mining|Platinum|PROJECT|Training|Operations
Africa|Design|Fabrication|Financial|Gold|Mining|Platinum|PROJECT|Training|Operations
africa|design|fabrication|financial|gold|mining|platinum|project|training|operations

Thaba Joint Venture project, South Africa – update

Image of Thaba project

Photo by Sylvania Metals

14th November 2025

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Thaba Joint Venture (JV) project.

Location
Northern part of the western limb of South Africa’s Bushveld Complex.

Project Owner/s
The project is an unincorporated 50:50 JV agreement between Sylvania Platinum’s wholly owned South African subsidiary Sylvania Metals, and Limberg Mining Company, a subsidiary of ChromTech Mining Company.

Project Description
The Thaba JV aims to process chrome tailings from historical dumps and run-of-mine (RoM) chrome ore from the Limberg chrome mine to produce platinum group metals (PGM), and chromite concentrate, expanding Sylvania’s operations and leveraging its expertise in chrome and PGM recovery. 

The project will add attributable yearly production of about 6 800 4E (platinum, palladium, rhodium and gold) PGM ounces, and introduce 210 000 t of chromite concentrate to Sylvania’s existing production profile, over a ten-year mine life.

Potential Job Creation
More than 150.

Net Present Value/Internal Rate of Return
The project has an estimated payback of three years.

Capital Expenditure
The project is estimated at $47-million (about R834-million).

Planned Start/End Date
Commissioning has started and is expected to continue ramping up throughout the first quarter of the 2026 financial year, with steady-state production expected in the second quarter.

Latest Developments
All project design work, fabrication and delivery of mechanical items have been completed.  

Following the recruitment and onboarding of operational employees in the first half of the 2025 financial year, with most of the personnel deployed to the site from January 2025, employees underwent comprehensive training and induction programmes to ensure that they are fully prepared for the startup and commissioning phases. These efforts are aimed at supporting a successful and productive ramp-up once the plant becomes operational. 

Key Contracts, Suppliers and Consultants
Not disclosed.

Contact Details for Project Information
Sylvania Platinum, tel +27 11 673 1171 or info@sylvaniaresources.com.


 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Comments

Showroom

Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 10 December 2025
Magazine round up | 12 December 2025
12th December 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.171 0.303s - 129pq - 2rq
Subscribe Now