https://newsletter.mw.creamermedia.com
Africa|Botswana|Diamonds|Exploration|Mining|Pipe|PROJECT|Systems|Drilling|Pipe
Africa|Botswana|Diamonds|Exploration|Mining|Pipe|PROJECT|Systems|Drilling|Pipe
africa|botswana|diamonds|exploration|mining|pipe-company|project|systems|drilling|pipe

Thorny River diamond dyke project, South Africa – update

Drilling an anomaly at the Thorny River project

Photo by Botswana Diamonds

12th August 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Thorny River diamond dyke project.

Location
The project is a consolidation of the Frischgewaagt, Hartbeesfontein and Doornrivier properties, in Limpopo, South Africa.

Project Owner/s
Diamond exploration and project development company Botswana Diamonds (BOD).

Project Description
Thorny River comprises the eastern extension of the kimberlite dyke and/or pipe systems on which the Klipspringer and Marsfontein mines are located, both of which have been economically mined.

The project has a modelled in situ grade range of 46 carats per hundred tonnes (cpht) to 74 cpht, and a diamond value range from $120/ct to $220/ct.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
Not stated.

Planned Start/End Date
Not stated.

Latest Developments
BOD has discovered two new blows at its Thorny River diamond project, which will increase the mineable kimberlite.

The mine plan is now being finalised and the mining permit application being prepared.

This discovery comes from the company’s latest drilling campaign at the project, where 12 reverse circulation holes were completed.

The objective of this drilling campaign was to expand the mineable kimberlite for the purpose of mine planning.

There were 52 m of kimberlite found, with the biggest intersection being 22 m.

Analysis of raw data shows that two of the targets resulted in the discovery of new subsurface blows, which will be added to the inventory.

“We have finished exploration and now move toward mine development. We already have a good understanding of how the mine will look. The recent drilling identified the entry point for a mine. The next stage is to refine the mine model and to apply for a mining permit,” chairperson John Teeling has said.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
BOD, tel +353 1 833 2833/+353 1 833 2833, fax +353 1 833 3505 or email info@botswanadiamonds.co.uk.

Edited by Creamer Media Reporter

Comments

Showroom

Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 
Willard
Willard

Rooted in the hearts of South Africans, combining technology and a quest for perfection to bring you a battery of peerless standing. Willard...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Martin Creamer talks about safety, ruthenium and a new palladium centre plan.
On-The-Air (18/04/2025)
19th April 2025 By: Martin Creamer
Magazine round up | 18 April 2025
Magazine round up | 18 April 2025
18th April 2025
Hillside Aluminium smelter in South Africa’s KwaZulu-Natal.
Hillside Aluminium guiding unchanged output for 2025 financial year
17th April 2025 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.132 0.278s - 129pq - 2rq
Subscribe Now