https://newsletter.mw.creamermedia.com
Building|Environment|Mining|PROJECT|Resources|Operations
Building|Environment|Mining|PROJECT|Resources|Operations
building|environment|mining|project|resources|operations

Thunderbird starts production ahead of schedule

23rd October 2023

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

The Thunderbird mineral sands project, in the Kimberley region of northern Western Australia, has started producing ore, several weeks ahead of the original final investment decision, ASX-listed Sheffield Resources reported on Monday.

The initial stages of ore processing would see a gradual ramp-up through to steady state processing, production of concentrates, and building of concentrate product stockpiles on site and at the Port of Broome in preparation for the first delivery of product to customers.

Sheffield said Kimberley Mineral Sands, its 50%-owned joint venture with Yansteel, would load the first shipment of concentrate product early in the first quarter of next year.

“Delivery of a greenfield mining project in Australia can be a challenging experience, particularly for a junior miner. Overcoming these hurdles, especially in the current inflationary environment to deliver first ore production ahead of schedule and under budget and without a lost-time injury is an outstanding achievement that each and every one associated with Thunderbird should be incredibly proud of,” said Kimberley executive chairperson Bruce Griffin, congratulating the team that successfully delivered the project.

The two-stage Thunderbird development pathway sees the initial Stage 1 mining and processing feed rate forecast at 1 085 t/h at the wet concentrate plant (WCP), with Stage 2 doubling the WCP feed rate to 2 170 t/h targeted during Year 5 of operations.

Stage 1 and 2 of operations are estimated to produce 1.4-million tonnes a year of zircon and ilmenite concentrates over an estimated 36-year life-of-mine.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Trotech
Trotech

Design, Construction and Maintenance of Site Erected, Welded Bulk Storage Tanks for the Petrochemical, LNG, Ammonia and Sustainable fuel Sectors.

VISIT SHOWROOM 
SafeQuip
SafeQuip

SafeQuip is a leading distributor and manufacturer of fire safety solutions, offering a comprehensive range of products designed to meet all...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

FAM Minerals & Mining South Africa team
FAM Minerals & Mining launches in South Africa
30th January 2026 By: Darren Parker
Transnet, RBCT, Exxaro manganese make headlines
Transnet, RBCT, Exxaro manganese make headlines
30th January 2026
Magazine cover image
Magazine round up | 30 January 2026
30th January 2026
Exxaro CEO Ben Magara.
Exxaro’s manganese entry points advance
29th January 2026 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.186 0.269s - 145pq - 2rq
Subscribe Now