https://newsletter.mw.creamermedia.com
Design|Efficiency|Energy|Engineering|Mining|PROJECT
Design|Efficiency|Energy|Engineering|Mining|PROJECT
design|efficiency|energy|engineering|mining|project

Tiris uranium project, Mauritania – update

Image of periodic table symbol for uranium

23rd August 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Tiris uranium project.

Location
Mauritania.

Project Owner/s
Aura Energy.

Project Description
A front-end engineering design (FEED) study has confirmed excellent economics and capital efficiency to develop Tiris into a globally significant near-term uranium operation.

The FEED proposes average base case production of 1.9-million pounds a year of uranium over a 17-year mine life.

Envisaged is a shallow free-dig openpit mining and beneficiation operation delivering a low-cost, high-grade leach feed averaging 1 997 parts per million (ppm) of uranium for the first five years and 1 743 ppm of uranium for the life-of-mine (LoM).

LoM production is estimated at 30.1-million pounds of uranium. The two-million-pound-a-year uranium processing plant is designed for future expansion beyond two-million pounds a year.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The FEED estimates an after-tax net present value (NPV) of $388-million, at an 8% discount rate, and an internal rate of return (IRR) of 36%.

Capital Expenditure
$230-million.

Planned Start/End Date
A final investment decision is expected in late 2024. Uranium production is planned within 18 months of the decision.

Latest Developments
Aura Energy has announced the completion of the previous restructuring of the uranium offtake agreement with London-based Curzon Uranium Trading. 

The restructuring of the agreement has materially increased the price receivable for planned uranium production at the project while releasing significant value for the project. 

The restructured offtake agreement improves the project NPV, at an 8% discount rate, by $22-million to $388-million and increases the IRR by 2% to 36%, compared with FEED design study economics delivered in February 2024.

With the additional funds, Aura has said it is well funded to progress the project to a final investment decision by the first quarter of 2025.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Aura Energy, tel +61 3 9101 8551 or email info@auraenergy.com.au.
 

Edited by Creamer Media Reporter

Comments

Showroom

Aqs image
AQS Liquid Transfer

AxFlow AQS Liquid Transfer (Pty) Ltd is an Importer and Distributor of Pumps in Southern Africa

VISIT SHOWROOM 
Tractor & Grader Supplies
Tractor & Grader Supplies

Tractor & Grader Supplies (TGS™): Your Trusted, Genuine Source for New Replacement Parts for Earthmoving, Construction and Mining Machinery

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 21 February 2025
Magazine round up | 21 February 2025
21st February 2025
BOLSTERING PRESENCE
The project is set to bolster Namibia’s position as one of the world’s leading uranium producers
Uranium mine moving closer to production
21st February 2025 By: Simone Liedtke

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:5.159 5.333s - 127pq - 2rq
Subscribe Now