https://newsletter.mw.creamermedia.com
Construction|Copper|flotation|Gold|Infrastructure|Mining|PROJECT|Roads|Services|Waste|Products|Infrastructure|Waste|Operations
Construction|Copper|flotation|Gold|Infrastructure|Mining|PROJECT|Roads|Services|Waste|Products|Infrastructure|Waste|Operations
construction|copper|flotation|gold|infrastructure|mining|project|roads|services|waste-company|products|infrastructure|waste|operations

Toroparu gold project, Guyana

Location map and flag of Guyana

7th November 2025

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Toroparu gold project.

Location
Guyana.

Project Owner/s
South America-focused gold mining company Aris Mining Corporation.

Project Description
A preliminary economic assessment (PEA), published in October 2025, has confirmed Toroparu as a large-scale, long-life openpit gold project with robust economics.

The PEA proposes a conventional truck-and-shovel operation with a strip ratio of 4.7 :1 (waste to mill feed) and a processing plant designed to treat a nominal seven-million-tonne-a-year, run-of-mine feed. The plant will produce two doré products and a copper/gold flotation concentrate. The two oxide and sulphide mill feed types will be stockpiled and processed separately during designated campaigns.

Total gold production over the estimated 21.3-year life-of-mine (LoM) is estimated at five-million ounces, with average yearly LoM gold production estimated at 235 000 oz.

The project site infrastructure will be organised into primary areas. This includes the Toroparu and Sona Hill openpits and processing plant, with supporting services, the tailings management facilities and site-wide infrastructure, including access roads, a tailings pipeline, an airstrip and a camp area.

Potential Job Creation
Development of the project will provide a diversity of employment and socioeconomic opportunities. A high percentage of the workforce will be hired from within Guyana. 

The workforce during the construction phase is estimated at between 1 292 to 1 520. During steady-state operations, the workforce is expected to increase to between 185 and 213 personnel.

Net Present Value/Internal Rate of Return
At a base case of $3 000/oz, the project has a net present value, at a 5% discount rate, of $1 805 and an internal rate of return of 25.2%, with a payback of three years.

Capital Expenditure
Initial construction capital is estimated at $820-million, including preproduction costs and contingency of $96-million.

Planned Start/End Date
Not stated.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
Not disclosed.

Contact Details for Project Information
Aris Mining, email info@aris-mining.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Comments

Showroom

ECG Engineering
ECG Engineering

ECG provides specialised electrical engineering services to the Mining, Utilities, Materials Handling and Industrial industries, with extensive and...

VISIT SHOWROOM 
Sweet-Orr
Sweet-Orr

Sweet-Orr, established in 1871, is a global leader in superior protective workwear, known for quality, innovation, and performance.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Platinum, Lion ferrochrome smelter make headlines
Platinum, Lion ferrochrome smelter make headlines
5th December 2025
Magazine round up | 05 December 2025
Magazine round up | 05 December 2025
5th December 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.172 0.307s - 131pq - 2rq
Subscribe Now