Troilus copper/gold project, Canada – update
Photo by Troilus Gold Corp
Name of the Project
Troilus copper/gold project.
Location
Frôtet-Evans greenstone belt in north-central Quebec, Canada.
Project Owner/s
Canadian project developer Troilus Gold Corp.
Project Description
The Troilus project comprises four main zones of mineralisation, located on a north-east/south-west trend covering covering about 7 km.
These deposits will be mined using conventional openpit mining methods over a 22-year period. Ore will be processed in a flotation mill to produce gold-rich copper concentrate for sale to a smelter, with provision for gravity gold recovery to produce doré after Year 1.
Life-of-mine (LoM) average payable gold production is estimated at 244 600 oz/y, 17.3-million pounds a year of copper and 446 700 oz/y of silver.
Peak payable gold production is estimated at 456 100 oz/y, 31.8-million pounds of copper and 613 600 oz of silver in Year 7.
Total LoM total payable gold is estimated at 5.4-million ounces, 382-million pounds of copper and 9.9-million ounces of silver.
Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 5% discount rate, of $1.56-billion and an internal rate of return of 18.1%, with an after-tax payback of 5.7 years.
Capital Expenditure
Initial capital expenditure is estimated at $1.07-billion.
Planned Start/End Date
Not stated.
Latest Developments
Troilus Gold continues to make strides in its financing efforts for the development of the project, with the announcement of a letter of intent (LoI) from Export Development Canada (EDC) for up to $300-million.
The new LoI from EDC builds upon the earlier LoIs announced with key European export credit agencies. Together, these LoIs represent up to $1.3-billion in potential financing.
In terms of the latest LoI, EDC is ready to consider providing up to $300-million in debt financing for the Troilus project, contingent upon a successful due diligence process that will assess economic, technical, environmental and social factors.
Key Contracts, Suppliers and Consultants
Not disclosed.
Contact Details for Project Information
Troilus Gold Corp, tel +1 647 276 0050 or email info@troilusgold.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation