https://newsletter.mw.creamermedia.com
PROJECT
PROJECT
project

Bécancour lithium carbonate plant, Canada

Image of periodic table symbol for lithium

29th November 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Bécancour lithium carbonate plant.

Location
Quebec, Canada.

Project Owner/s
Lithium Universe.

Project Description
The facility will be engineered to process spodumene concentrate sourced worldwide.

The project will produce about 18 270 t/y of lithium carbonate over a 20-year mine life.

The required feedstock for the plant will be 140 000 t/y at a 6% lithium oxide-(Li2O-) grade; however, the plant has been designed to receive grades as low as 5% Li2O. Industry-supplied spodumene averages at about 5.5% Li2O.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The prefeasibility study is economically viable, with a pretax net present value, at an 8% discount rate, of about $779-million and internal rate return of about 23.5%, with a payback of 3.5 years.

Capital Expenditure
$494-million.

Planned Start/End Date
Not stated.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
No information provided.

Contact Details for Project Information
Lithium Universe, tel +61 2 8046 2799 or email info@lithiumuniverse.com.
 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Comments

 

Showroom

Hanna Instruments (Pty) Ltd
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 
Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 10 December 2025
Magazine round up | 12 December 2025
12th December 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.194 0.342s - 128pq - 2rq
Subscribe Now