The Bomboré mine achieved commercial production on its oxide operations on December 1, 2022, and is now focused on its staged hard-rock expansion that is expected to materially increase yearly and life-of-mine gold production from the processing of hard-rock mineral reserves. The processing complex comprises a six-million-tonne a-year oxide plant.
Orezone plans to expand production by building an independent hard-rock plant adjacent to the oxide plant that is in operation. Stage 1 of the hard-rock expansion under construction will provide a hard-rock processing capacity of 2.5-million tonnes a year, and will increase the overall gold production profile at Bomboré to between 170 000 oz/y and 185 000 oz/y.
The Stage 2 expansion will increase the hard-rock plant throughput to five-million tonnes a year through the addition of processing units within the Stage 1 footprint. These primarily comprise four additional carbon-in-leach tanks, an oxygen plant, ball mill, thickener and pebble crusher. The Stage 2 expansion is forecast to increase the overall gold production profile at Bomboré to between 220 000 oz/y and 250 000 oz/y.
Potential Job Creation
The Stage 2 expansion will create several hundred new employment opportunities during construction, in addition to the estimated 2 400 direct local jobs that currently support existing operations.
Net Present Value/Internal Rate of Return
Not stated.
Capital Expenditure
Preliminary cost estimates for this Stage 2 expansion are from $90-million to $95-million.
Planned Start/End Date
First gold from the Stage 1 hard-rock plant is scheduled for the fourth quarter of 2025, with the targeted achievement of nameplate capacity by the end of 2025. Stage 2 has a construction period of 14 months. In the current record gold price environment, Orezone is evaluating an earlier start for Stage 2 by up to two years, allowing for completion of the Stage 2 expansion construction by late 2026.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
Not disclosed.
Contact Details for Project Information
Orezone Gold Corporation, tel +1 778 945 8977 or email info@orezone.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation