Canyon makes headway in Cameroon
PERTH (miningweekly.com) – Bauxite developer Canyon Resources has negotiated the key terms for the Minim Martap mining convention, with the government of Cameroon, while also delaying the release of its bankable feasibility study (BFS) for the project until January.
Canyon Resources on Wednesday told shareholders that the company had identified some material opportunities to optimise the BFS and improve the project efficiency and economics, which has necessitated additional time to complete the study.
Detailed rail optimisation studies have forecast significant improvements to the capacity of the rail line, while updated train simulation modelling has predicted an increase of 20% rail traffic capacity on the existing rail line.
Separately, on-going negotiations with the Douala Port Authority and Camrail have identified an alternative rail unloading and barge loading solution at the port that will facilitate operations and easily accommodate future increases in production.
Parallel to the railway studies, China Minmetals Corporation developed the mining schedule, haul road, inland rail facility and port designs. The company is now revisiting the mining schedule and designs to ensure capital and operating costs accurately reflect the project’s increased throughput in line with the increased rail capacity identified.
Meanwhile, Canyon has completed the fourth round of government negotiations for the Minim Martap Mining Convention, and a formal execution of the convention is now anticipated for the first quarter of next year.
“We are very pleased with the positive outcome of the negotiations and are appreciative of the Ministry of Mines hosting the very productive discussions over the past few weeks. It is clear that all sides involved see the short- and long-term benefits of the Minim Martap bauxite project to the State of Cameroon and there is a positive intent to see the project developed,” said MD Phillip Gallagher.
“Having completed this important step with the State of Cameroon, the company can now enter into binding rail and port agreements as well as advance project financing and strategic partner discussions.”
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation