Name of the Project
Doropo gold project.

Location
Côte d'Ivoire, between the Comoè National Park and the international border with Burkina Faso.

Project Owner/s
Centamin.

Project Description
Doropo has probable mineral reserves of about 1.88-million ounces at an average grade of 1.53 g/t of gold, supporting a ten-year life-of-mine (LoM). 

The project will use openpit mining and a carbon-in-leach processing circuit.

The project envisages a contract mining operation, mining a maximum of 28-million tonnes a year of material and delivering up to 4.9-million tonnes a year of ore to the run-of-mine pad and stockpiles, with variation based on the location and the combination of oxide, transition and fresh ore mined. The project plans to mine 38-million tonnes of ore, to be fed into the process plant, and 188-milion tonnes of waste over the LoM. 

Total production over the LoM is estimated at 1.67-million ounces, with an average of 207 000 oz/y of gold in the first five years.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an after-tax net present value of $426-million, at an 8% discount rate and an internal rate of return of 34%, with a payback of 2.1 years.

Capital Expenditure
$373-million, including contingency.

Planned Start/End Date
First gold is expected 27 months after the final investment decision.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Centamin, tel +44 1534 828700 or email info@centamin.com.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Latest Multimedia

 

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
BOVA Safety Wear
BOVA Safety Wear

BOVA cemented their reputation in Africa by delivering high quality engineering through their range of safety footwear. 21 years after producing...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hillside Aluminium smelter in South Africa’s KwaZulu-Natal.
Hillside Aluminium guiding unchanged output for 2025 financial year
17th April 2025 By: Martin Creamer
Andrada CEO Anthony Viljoen.
Andrada looking to opening more mines in Namibia
16th April 2025 By: Martin Creamer
Resources Watch
Resources Watch
16th April 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.138 0.269s - 128pq - 2rq
Subscribe Now