https://newsletter.mw.creamermedia.com
Construction|Exploration|Gold|Mining|PROJECT|Resources|Surface|Underground|Drilling
Construction|Exploration|Gold|Mining|PROJECT|Resources|Surface|Underground|Drilling
construction|exploration|gold|mining|project|resources|surface|underground|drilling

Fourmile gold project, US

Image of gold nugget/dust

3rd October 2025

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Fourmile gold project.

Location
Nevada, US.

Project Owner/s
Gold mining company Barrick Mining Corporation.

Project Description
Barrick has reported Fourmile as a “rare combination of grade, scale and exploration upside, confirming its potential to become one of the world’s leading gold producers”.

The preliminary economic assessment (PEA) outlines the potential to achieve globally significant average gold production of between 600 000 oz/y and 750 000 oz/y at low mining rates of 1.5-million to 1.8-million tonnes a year of ore.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
The PEA estimates capital expenditure of between $1.5-billion and $1.7-billion.

Planned Start/End Date
Not stated.

Latest Developments
Barrick plans to continue ramping up its current fleet of 16 surface rigs to more than 20 rigs, with about 120 km of directional surface drilling planned in 2026. 

The drill programme is targeting 30 m to 35 m drill spacing for indicated resources and 80 m to 90 m for inferred resources, which translates to 370 km of surface drilling and 80 km of underground drilling by the end of 2028.

Simultaneously, Barrick is progressing the permitting of the Bullion Hill exploration decline and expectations are that the company will start construction of the portal and underground development in 2026. 

Further, the Goldrush multipurpose development is still advancing towards the Fourmile boundary. This underground development is expected to provide critical underground exploration drill access to the deeper portions of the orebody from 2027 onwards.

By 2029, Barrick plans to have 34 km of development in place, connecting Bullion Hill with the Goldrush multipurpose development and setting the mine up for the initial test stoping shortly thereafter. As Fourmile starts its production ramp-up, it will offset low-grade 1.8 g/t stockpiles.

Key Contracts, Suppliers and Consultants
None disclosed.

Contact Details for Project Information
Barrick Mining Corporation, tel +1 416 682 3860 or email investor@barrick.com.

Edited by Creamer Media Reporter

Comments

Latest Multimedia

Photo of Martin Creamer
On-The-Air (03/10/2025)
Updated 2 hours 2 minutes ago By: Martin Creamer

Showroom

Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 
SABAT
SABAT

From batteries for boats and jet skis, to batteries for cars and quad bikes, SABAT Batteries has positioned itself as the lifestyle battery of...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 03 October 2025
Magazine round up | 03 October 2025
3rd October 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.099 0.236s - 128pq - 2rq
Subscribe Now