https://newsletter.mw.creamermedia.com
Gold|Infrastructure|Power|PROJECT|Resources|Roads|Surface|Underground|Infrastructure
Gold|Infrastructure|Power|PROJECT|Resources|Roads|Surface|Underground|Infrastructure
gold|infrastructure|power|project|resources|roads|surface|underground|infrastructure

Hillgrove gold/antimony project, Australia

Aerial view of the Hillgrove openpit

Photo by Larvotto Resources

27th September 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Hillgrove gold/antimony project.

Location
News South Wales, Australia.

Project Owner/s
Larvotto Resources.

Project Description
The Hillgrove mine operated for 30 years as an antimony-focused operation and 100 years prior as a successful high-grade gold mine. The project comprises surface infrastructure, which includes the process plant, power, roads, a decline and substantial underground development.

A prefeasibility study has proposed production of 41 100 oz of gold and 5 400 t of antimony over a seven-year mine life.

This is the first time that gold and antimony will be targeted with equal priority at Hillgrove.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Using conservative gold and antimony prices of $2 000 and $15 000 respectively, the project has an estimated after-tax net present value, at an 8% discount rate, of $157-million and an internal rate of return of 49.6%, with a payback of two years.

Capital Expenditure
The project will cost less than $73.4-million to develop.

Planned Start/End Date
The project is targeting first ore by early 2026.

Latest Developments
The Larvotto board has approved the immediate start of the definitive feasibility study, which is expected to be completed by the end of 2024.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Larvotto Resources, tel +61 8 6373 0112 or email info@larvottoresources.com.
 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Comments

Latest News

Magazine round up | 10 December 2025
Magazine round up | 12 December 2025
12th December 2025

Showroom

Axiom Hydraulics
Axiom Hydraulics

Axiom Hydraulics is a trusted leader in South Africa’s hydraulic industry, delivering world-class components, systems, and engineering expertise...

VISIT SHOWROOM 
Flanders Electrical SA
Flanders Electrical SA

FLANDERS Southern Africa provides integrated solutions for mining and industrial operations, covering field services, automation, electrification,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 10 December 2025
Magazine round up | 12 December 2025
12th December 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.119 7.877s - 129pq - 2rq
Subscribe Now