https://newsletter.mw.creamermedia.com
Construction|Energy|Industrial|Infrastructure|Mining|PROJECT|Renewable Energy|Renewable-Energy|Solar|Trucks|Turbines|Underground|Equipment|Infrastructure|Turbines
Construction|Energy|Industrial|Infrastructure|Mining|PROJECT|Renewable Energy|Renewable-Energy|Solar|Trucks|Turbines|Underground|Equipment|Infrastructure|Turbines
construction|energy|industrial|infrastructure|mining|project|renewable-energy|renewable-energy-company|solar|trucks|turbines-company|underground|equipment|infrastructure|turbines-person

Jadar lithium-borates project, Serbia – update

Drill core from the Jadar lithium project

Photo by ©Rio Tinto

19th July 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Jadar lithium-borates project.

Location
Near the City of Loznica, western Serbia.

Project Owner/s
Rio Tinto.

Project Description
Jadar is touted to be one of the biggest industrial investments in Serbia.

The project proposes to produce battery-grade lithium carbonate, a critical mineral used in large-scale batteries for electric vehicles, and in storing renewable energy, and will position Rio Tinto as the biggest source of lithium supply in Europe for at least 15 years.

The project is also expected to produce borates, which are used in solar panels and wind turbines. The development is expected to include an underground mine with associated infrastructure and equipment, as well as electric haul trucks and a beneficiation chemical processing plant.

Following ramp-up to full production, the mine would produce about 58 000 t/y of lithium carbonate, 160 000 t/y of boric acid and 255 000 t/y of sodium sulphate, making Rio Tinto one of the top ten lithium producers in the world. Based on this yearly production of lithium carbonate, Rio Tinto aims to produce 2.3-million tonnes of lithium carbonate over the expected 40-year life-of-mine.

Potential Job Creation
The project will create 2 100 jobs during construction, and 1 000 mining and processing jobs once in production.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
$2.4-billion.

Planned Start/End Date
First saleable production is expected in 2027, with full production expected in 2029.

Latest Developments
Rio Tinto has welcomed a Serbian court ruling on July 11 that overturned a government decision in 2022 to revoke its initial planning permission to develop a lithium mine in the country.

The Serbian Constitutional Court said government had "overstepped the limits of its competence" by ruling against the mine's so-called spatial plan permit, and that the decision had been unconstitutional.

If developed, the project could cover 90% of Europe’s current lithium needs and help the company to become a leading lithium producer.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Rio Tinto (Serbia), tel +381 15 872 834.
 

Edited by Creamer Media Reporter

Comments

Latest Multimedia

 

Showroom

Goodwin Submersible Pumps Africa (Pty) Ltd
Goodwin Submersible Pumps Africa (Pty) Ltd

Goodwin Submersible Pumps Africa is sole distributors for Goodwin electrically driven, submersible, abrasion resistance slurry pumps.

VISIT SHOWROOM 
M and J Mining
M and J Mining

M and J Mining are leading suppliers of physical support systems as used by the underground mining industry. Our selection of products are not...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hillside Aluminium smelter in South Africa’s KwaZulu-Natal.
Hillside Aluminium guiding unchanged output for 2025 financial year
17th April 2025 By: Martin Creamer
Andrada CEO Anthony Viljoen.
Andrada looking to opening more mines in Namibia
16th April 2025 By: Martin Creamer
Resources Watch
Resources Watch
16th April 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.134 0.263s - 129pq - 2rq
Subscribe Now