Kiaka gold project, Burkina Faso
Photo by West African Resources
Name of the Project
Kiaka gold project.
Location
About 45 km south of West African Resources’ (WAF’s) existing Sanbrado gold mine, in Burkina Faso.
Project Owner/s
WAF (90%) and the government of Burkina Faso (10%).
Project Description
A feasibility study update published on July 2, 2024, has confirmed the strong cash flows expected from the project and incorporates improvements of the project’s initial feasibility study, released on August 3, 2022. Average gold production is estimated at 258 000 oz/y in the first five years and at 234 000 oz/y over the forecast 20-year mine life.
The 2024 feasibility update incorporates a change from contract mining to an owner mining strategy, enabling WAF to realise greater benefits from the long-life and consistent mining rates of the large-scale Kiaka openpit operations. The investment includes new, larger-sized equipment and robust, fully equipped mine maintenance facilities. Bigger 230 t excavators have been matched to bigger 140 t dump trucks, compared with the 140 t excavators and 95 t trucks used in the 2022 feasibility study, allowing for an increase in the openpit mining rate by 3.3-million tonnes a year.
The 2024 feasibility study update is based on conventional openpit mining methods, with run-of-mine ore being directly fed to the crushing circuit. Kiaka’s free-milling gold ore will be processed through a conventional single-stage gyratory crushing and semiautogenous ball mill crusher milling circuit followed by carbon-
in-leach processing.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has an improved after-tax net present value, at a 5% discount rate, of $1.18-billion and an internal rate of return of 27%, with a pretax payback of 2.25 years on preproduction development capital.
Capital Expenditure
The feasibility study update estimates preproduction development capital at $447-million, excluding owner mining.
Planned Start/End Date
Kiaka is on schedule for first gold production in the third quarter of 2025.
Latest Developments
As of July 2, 2024, the development of Kiaka was 50% complete.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
West African Resources, tel +61 8 9481 7344 or email info@westafricanresources.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation