https://newsletter.mw.creamermedia.com

Orapa No. 2 ore processing plant on planned annual maintenance shutdown

12th May 2025

     

Font size: - +

Debswana Diamond Company wishes to clarify that Orapa No. 2 plant is undergoing its annual scheduled maintenance shutdown for the month of May and has not ceased operations as reported in the media. This planned shutdown is a routine operational process designed to ensure the plant remains efficient and reliable in order to enhance safety and optimize performance.

The planned maintenance at the Orapa No.2 Plant is a standard routine operational procedure conducted each year to ensure continued efficiency, safety, and reliability of the Plant. It is a proactive measure that supports long-term safety performance and operational excellence. Typically, the dates for maintenance shutdowns are scheduled well in advance and timely communication of these made to employees, contractors and relevant stakeholders.

As previously communicated, in March 2025, the Debswana Board approved a set of strategic measures in response to the ongoing market conditions. These included rationalization of production by placing the tailings treatment facilities at Letlhakane and Jwaneng Mines under long-term asset preservation, while maintaining mainstream carats production at the Orapa No. 2 Ore Processing Plant and the Jwaneng Main Treatment Plant.

We urge all contractors, business partners and stakeholders to continue relying on our official communication channels and engagements for business updates and any new developments regarding Debswana matters.

 

Edited by Creamer Media Reporter

Comments

Showroom

Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 
AutoX
AutoX

We are dedicated to business excellence and innovation.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 09 May 2025
Magazine round up | 09 May 2025
9th May 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.064 0.137s - 131pq - 2rq
Subscribe Now