https://newsletter.mw.creamermedia.com
Energy|Nuclear|PROJECT|Projects|Drilling|Operations
Energy|Nuclear|PROJECT|Projects|Drilling|Operations
energy|nuclear|project|projects|drilling|operations

Peninsula expands Lance uranium resource estimate

13th May 2024

By: Creamer Media Reporter

     

Font size: - +

ASX-listed Peninsula Energy has announced qn updated mineral resource estimate (MRE) of 58-million pounds of uranium oxide (U3O8) for the Lance project, in Wyoming.

The updated resource estimate is based on the results of 2023 drilling in the Ross and Kendrick areas and represents a 7.8% improvement from the previous estimate.

The MRE within the life-of-mine study areas has increased by 19.6% to 26.2-million pounds of U3O8.

MD and CEO Wayne Heili said that the resource growth came at an opportune time with the US government continuing to take action to reinvigorate domestic uranium production and nuclear fuel cycle capacity.

Peninsula is preparing to resume commercial production at its Lance projects and previously said that operations should resume by late 2024.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 
Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 07 November 2025
Magazine round up | 07 November 2025
7th November 2025
Resources Watch
Resources Watch
5th November 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.137 0.212s - 146pq - 2rq
Subscribe Now