Polyus delivers solid H1 operational results
JOHANNESBURG (miningweekly.com) – Continuing to build on its position as a low-cost gold producer with a clear growth strategy, Russia-based Polyus delivered consistent production in the half-year ended June 30, achieving a 12% year-on-year increase to 938 000 oz.
The company – Russia’s largest gold producer – attributed this output growth to higher production volumes at its Olimpiada and Verninskoye operations. Polyus also saw a significant 29% year-on-year increase in volumes of ore mined, to 17.8-million tonnes, as a result of mining volumes growth at the Olimpiada and Kuranakh operations and the start of full-scale mining activity at Natalka.
Further, with throughput capacity expansion projects at Polyus’s core assets either being completed or entering the second stage of implementation, the miner increased volumes of processed ore by 5% year-on-year to 13.6-million tonnes.
“Over the course of the first half, we remained focused on operational efficiency, while making strong progress on our development projects,” commented Polyus CEO Pavel Grachev, adding that the company will keep its 2017 production guidance target of 2.08-million ounces to 2.13-million ounces.
“With the majority of our brownfield development projects scheduled for completion in 2017/18 and production at Natalka expected to be commissioned by the end of 2017, Polyus now expects total gold output to further increase to between 2.35-million ounces and 2.40-million ounces in 2018 and to 2.8-million ounces in 2019,” he said.
Meanwhile, Polyus’s gold sales for the period under review were up 14% year-on-year to $1.22-million, with the average selling price of $1.26/oz, 2% above the London Bullion Market spot price.
Net debt decreased to $3.08-million from $3.13-million, as at the end of the first quarter of 2017, and $3.24-million as at the end of 2016.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation