Potash handling facility, Canada

Image of potash

3rd September 2021

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Potash handling facility.

Location
Saskatchewan, Canada.

Project Owner/s
Westshore Terminals Limited Partnership, a wholly owned subsidiary of Westshore Terminals Investment Corporation.

Project Description
The project entails the construction of infrastructure to handle potash from BHP’s Jansen potash mine, in Saskatchewan, until 2051.

Westshore is designing and will build the necessary infrastructure to handle potash, including a potash dumper, a storage building and associated conveying systems.

The potash dumper and conveying system have been designed to handle volumes equivalent to the maximum yearly bulk material throughput at Berth 2. For volumes above Stage 1, it is expected that the potash storage building will be expanded, with the building being designed accordingly. BHP is entitled, but not required, to use Westshore’s facilities for increased output from the Jansen mine beyond Stage 2.

Certain existing infrastructure at Westshore’s terminal will be modified to support potash handling. Potash will be loaded only at the terminal’s Berth 2, which will continue to be available for loading coal. Coal operations are expected to continue without undue disruption through the construction phase.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
BHP will substantially fund the construction of the potash handling facilities, with Westshore being responsible for construction costs that exceeds the agreed-upon budget. Westshore will also contribute an aggregate of up to $33-million pertaining to specific infrastructure or unexpected permitting conditions that are encountered.

Planned Start/End Date
Construction is expected to start in 2022 and is required to be available by 2026.

Latest Developments
Westshore must obtain certain permits to start construction. Westshore has been in discussions with the relevant authorities, principally the Vancouver Fraser Port Authority. Westshore expects that the required permits will be issued in the first half of 2022, following which construction will start.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Westshore Terminals Investment Corporation, tel +1 604 946 4491 or email info@westshore.com.

Edited by Creamer Media Reporter

Comments

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Martin Creamer talks about safety, ruthenium and a new palladium centre plan.
On-The-Air (18/04/2025)
19th April 2025 By: Martin Creamer
Magazine round up | 18 April 2025
Magazine round up | 18 April 2025
18th April 2025
Hillside Aluminium smelter in South Africa’s KwaZulu-Natal.
Hillside Aluminium guiding unchanged output for 2025 financial year
17th April 2025 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.108 2.378s - 129pq - 2rq
Subscribe Now