Tavşan heap-leach project, Türkiye – update

Name of the Project
Tavşan heap-leach project.
Location
Western Türkiye.
Project Owner/s
Tavşan has been developed by Zenit Madencilik, in which Ariana Resources holds a 23.5% interest, alongside partners Proccea Construction and Ozaltin Holding.
Project Description
Tavşan hosts a Joint Ore Resources Committee 2012-compliant resource of 311 000 oz of gold and 1.1-million ounces of silver, underpinning an eight-year mine life with potential for further resource growth.
Potential Job Creation
Once in production, the Tavşan mine will be a significant employer in the region, with about 100 local people expected to be permanently employed.
Net Present Value/Internal Rate of Return
Not stated.
Capital Expenditure
Not disclosed.
Planned Start/End Date
Mining started in 2024. The project reached full operation in October 2025.
Latest Developments
The project is now fully operational, with final permitting received and ore loading under way.
Gold production from the heap-leach is expected to start later this quarter once sufficient ore has been loaded and leaching starts. About 800 000 t of ore is currently stockpiled, while crushing has been ongoing since August.
Ariana has said that high-grade ore trucking to the Kiziltepe carbon-in-leach processing plant will continue, benefiting from higher recovery rates.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Ariana Resources, tel +44 203 476 2080 or email info@arianaresources.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















