Tuvatu gold project, Fiji – update
Photo by Lion One
Name of the Project
Tuvatu gold project.
Location
On the island of Viti Levu, in Fiji.
Project Owner/s
Lion One.
Project Description
The project has demonstrated robust economic potential for a low-cost, high-grade gold operation with low upfront capital costs.
The project has an indicated resource of 1.01-million tonnes grading 8.5 g/t of gold and an inferred resource of 1.33-million tonnes grading 9 g/t of gold.
The updated PEA states the project’s gold production capacity at an average rate of 78 000 oz/y, at 8.6 g/t gold over a five-year mine life for a total 331 300 oz.
Lion One plans to operate at an initial production capacity of 300 t/d for the initial 18 months of operations before increasing the capacity to 500 t/d in mid-2025. The initial mining will focus on the near-surface resource while advancing underground development into high-grade mineralisation in Zone 500.
The processing plant will treat material using a two-stage crushing process, with a primary jaw crusher and secondary cone crusher feeding a two-stage grinding circuit.
The ground material will feed an integrated two-stage gravity concentration circuit, with some concentrates treated by an intensive cyanide leaching reactor and the remainder of the concentrates leached using conventional cyanide carbon-in-leach technology.
Gold will be recovered from the gold-laden carbon using conventional absorption- desorption recovery technology and smelted on site to produce gold doré bars.
The leached tailings will be treated using a sulphur dioxide/air process to remove any residual cyanide. Filtered tailings will be transported to Lion One’s tailings storage facility 3.5 km from the Tuvatu mine site.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 5% discount rate, of $155.8-million and an internal rate return of 60.3%, with a payback of five years.
Capital Expenditure
The project has a capital expenditure of $66.8-million.
Planned Start/End Date
The company is fully funded to complete mine construction and bring the Tuvatu alkaline gold project into production by the end of 2023.
Latest Developments
Lion One Metals has reported that first production is still on track for the fourth quarter of this year.
Mine construction is 75% complete and remains on track. Earthworks and concrete works are 70% complete, with more than 3 500 m3 of concrete poured to date.
Once complete, Lion One plans to operate the processing plant at an initial production capacity of 300 t/d for the first 18 months of operations before increasing the capacity to 500 t/d in mid-2025.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Lion One, tel +1604998 1250 or email info@liononemetals.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation