https://newsletter.mw.creamermedia.com
blasting|Building|Coal|Construction|Energy|Housing|Mining|PROJECT|Projects|Resources|Underground|Water|Operations
blasting|Building|Coal|Construction|Energy|Housing|Mining|PROJECT|Projects|Resources|Underground|Water|Operations
blasting|building|coal|construction|energy|housing|mining|project|projects|resources|underground|water|operations

Udumo Adit housing relocation project 80% complete

image of the Udumo Adit mining its first coal

FIRST COAL To save on costs of the establishment of the Udumo Adit, most projects, which includes the relocation project, were primarily managed by the in-house Kangra team

25th February 2022

By: Theresa Bhowan-Rajah

journalist

     

Font size: - +

Coal mining company Kangra, a subsidiary of mining investment company Menar, is nearing the completion of its Udumo Adit housing relocation project, in Donkerhoek, Mpumalanga. Udumo shaft (previously known as Twyfelhoek mine) forms part of one of the planned shafts to access the Kusipongo resource that has a coal reserve of about 41.9-million tons which could extend the life of the mine by more than 20 years.

In line with the requirements set out by the Department of Mineral Resources and Energy, families residing within 500 m of blasting operations had to be relocated before any blasting took place.

“After negotiations with local community forums and individual homeowners, agreements were reached to relocate the families, temporarily, into park home facilities while constructing their new homes.

“Building plans were signed off based on the families’ houses being replaced on a like-for-like basis, we are replacing mostly mud houses with brick-and-mortar houses based on the same floor areas of the current houses owned by the affected families,” says Kangra GM Pierre Louw.

The project, which entails the construction of new homes for the families which had to be relocated within the 500 m from the blasting area of the Adit, started in August last year and is approximately 80% completed. The project is expected to be completed by the end of March 2022.

He tells Mining Weekly that Menar’s in-house building division, Tsakane, is overseeing the housing relocation project, with local company Die Far responsible for constructing the houses.

He notes that they have not progressed without challenges.

“One of the biggest challenges was the excessive rainfall that the region had in December and at the beginning of January. This has slowed the building processes,” he states.

As part of the social and labour plan, Kangra mine is in discussions with a potential supplier to establish a cost-effective way of supplying the community of the eight farms identified in the Donkerhoek area with potable water at agreed-upon water points on the different farms.

“Kangra would like to conclude the discussions with the potential supplier and draft a final implementation proposal by midyear for approval by the board. Once the social and labour plan is approved, construction will start.”

While no contractors and project managers have been appointed for this particular project yet, the number and scope of contractors will be determined as part of the implementation proposal, adds Louw.

“To save on costs of the establishment of the Udumo Adit, most projects, which includes the relocation project, were primarily managed by the in-house Kangra team. This team has done outstanding work to complete the projects for Kangra to gain access to the underground resources on time,” he concludes.

Edited by Nadine James
Features Deputy Editor

Comments

Showroom

Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
Aqs image
AQS Liquid Transfer

AxFlow AQS Liquid Transfer (Pty) Ltd is an Importer and Distributor of Pumps in Southern Africa

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer
Magazine round up | 15 November 2024
Magazine round up | 15 November 2024
15th November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.057 0.136s - 131pq - 2rq
Subscribe Now