https://newsletter.mw.creamermedia.com
Crushing|Dewatering|Excavator|flotation|Mining|PROJECT|Sensor|Systems|Technology|Water|Drilling
Crushing|Dewatering|Excavator|flotation|Mining|PROJECT|Sensor|Systems|Technology|Water|Drilling
crushing|dewatering|excavator|flotation|mining|project|sensor|systems|technology|water|drilling

Uis Phase 2 expansion project, Namibia – update

Image of Uis tin project

Photo by Andrada Mining

1st December 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Uis Phase 2 expansion project.

Location
Namibia.

Project Owner/s
Andrada Mining, formerly AfriTin Mining.

Project Description
The historical Uis mine was owned and operated by Iscor from 1958 to 1991 as a tin mine.

The Uis project comprises a total non-Joint Ore Reserves Committee-compliant mining reserve (provided for guidance purposes only) of 134-million tonnes of ore, which could result in a mine life of 14 years. The mining plan features a production rate of ten-million tonnes a year of run-of-mine (RoM) ore at an average overburden stripping ratio of 2.6.

Andrada, formerly AfriTin, has set out to re-establish the Uis operation in two phases. Phase 1 is a low-capital, cash-generating initial production facility serving as a pilot for Phase 2, which is planned as a scaled-up version of the initial phase. The beneficiation process may involve dry crushing of the RoM ore and sensor-based ore sorting once confirmed through testwork.

The preconcentrates from this process could then be treated through various wet concentration circuits to produce saleable concentrates. The tin and tantalum minerals could be preconcentrated using X-ray transmission ore sorting and concentrated through dense-media separation (DMS), gravity separation and magnetic separation. The lithium mineral petalite could be preconcentrated using near-infrared ore sorting, concentrated using DMS, and cleaned using milling and flotation.

Mining will comprise conventional openpit methods using low-carbon, truck-and-excavator combinations, and is planned to be conducted over multiple pegmatite orebodies from four to five pits concurrently. A zero-effluent plant is planned to include dewatering systems for all concentrate and discard streams to aim for maximum water conservation and eliminate the need for tailings dams.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an after-tax net present value, at an 8% discount rate, of $2.1-billion and an internal rate of return of 75%, with a payback of 1.5 years.

Capital Expenditure
Initial capital expenditure is estimated at $440-million, including a 30% contingency.

Planned Start/End Date
Not stated.

Latest Developments
Andrada has reported that resource validation drilling is planned over the northern and central pegmatite clusters at the Uis project to enhance the current mineral resource estimate classification of tin, to establish the mineral potential for lithium and other technology metals. 

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Andrada Mining, tel +27 11 268 6555.

To watch Creamer Media's latest video reports, click here
 

Edited by Creamer Media Reporter

Comments

Showroom

The Southern African Institute of Mining and Metallurgy
The Southern African Institute of Mining and Metallurgy

The SAIMM started as a learned society in 1894 after the invention of the cyanide process that saved the South African gold mining industry of the...

VISIT SHOWROOM 
WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer
Magazine round up | 15 November 2024
Magazine round up | 15 November 2024
15th November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:2.738 2.872s - 164pq - 2rq
Subscribe Now