Yaouré gold mine – CMA underground project, Côte d'Ivoire

Yaouré site map

Photo by Perseus Mining

25th April 2025

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Yaouré gold mine – CMA underground project.

Location
Southern edge of Lake Kossou, 35 km north-west of the capital city of Yamoussoukro, in Côte d’Ivoire.

Project Owner/s
Perseus Mining.

Project Description
The CMA underground project will become Côte d’Ivoire’s first mechanised underground mine.

Yaouré has combined measured and indicated mineral resources estimated at 55.6-million tonnes grading 1.52 g/t gold containing 2.7-million ounces of gold. This includes 7.4-million tonnes grading 4.16 g/t gold containing 996 000 oz of gold associated with the CMA underground project.

A further 17.4-million tonnes of material, grading 1.7 g/t gold, containing 926 000 oz of gold are classified as inferred mineral resources. This includes 4.5-million tonnes grading 3.5 g/t containing 510 000 oz of gold associated with the CMA underground project.

The project, when combined with the openpit ore sources, based on the current estimate of ore reserves, will extend the Yaouré gold mine’s operational life until at least 2035. The move to underground operations allows for further use of the CMA deposit, which has proved to be a reliable foundation of the Yaouré operation to date.

At steady-state production rates, it is planned that underground ore will represent about 20% of the tonnes of ore mined on the site from opencut and underground operations, and will be mined at 700 000 t/y to 770 000 t/y over the life of the currently defined underground operation.

There is potential for further life extensions through additional discoveries of mineralisation down dip from the currently delineated mineralisation.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
The approved capital for the development for the CMA underground is $124.6-million.

Planned Start/End Date
Project development is due to start in mid-2025 with the development of the first portal. First production is targeted for the first quarter of the 2027 financial year, with commercial production expected to start in the 2027 financial year.

Latest Developments
Perseus Mining reported in February 2025 that work to establish surface infrastructure, including camp, electrical tie-in and maintenance areas to support the underground operations, was progressing well.

Openpit mining in the CMA pit has recently exposed the planned underground access locations; these areas are being prepared to make the initial excavation in the first quarter of the 2026 financial year.

Key Contracts, Suppliers and Consultants
Byrnecut (primary mining contractor for the project).

Contact Details for Project Information
Perseus Mining, tel +61 8 6144 1700 or email IR@perseusmining.com.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

 

Showroom

Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 02 May 2025
Magazine round up | 02 May 2025
2nd May 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.096 0.238s - 130pq - 2rq
Subscribe Now