https://newsletter.mw.creamermedia.com
Contractor|Gold|Infrastructure|Installation|Mining|Power|Resources|Transformer|Tunnelling|Underground|Equipment|Tunnelling|Infrastructure|Operations|Transformer
Contractor|Gold|Infrastructure|Installation|Mining|Power|Resources|Transformer|Tunnelling|Underground|Equipment|Tunnelling|Infrastructure|Operations|Transformer
contractor|gold|infrastructure|installation|mining|power|resources|transformer-company|tunnelling-company|underground|equipment|tunnelling|infrastructure|operations|transformer

Ascot to restart Premier mill in August

15th April 2025

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

Vancouver-based Ascot Resources plans to restart operations at its Premier gold mill in British Columbia in early August, following a delay caused by labour shortages that slowed underground development.

The company said on Tuesday that it would initially operate the 2 500-t/d facility on a campaign basis, processing 1 250 t/d on a two-weeks-on, two-weeks-off schedule. 

Ore will be sourced from both the Premier Northern Lights (PNL) and Big Missouri deposits.

Full-scale operations at the mill, located near Stewart, are expected in the first half of 2026 once mining begins at the nearby Silver Coin deposit. At that point, Ascot aims to ramp up to nameplate capacity of 2 500 t/d, running continuously seven days a week.

Recruitment efforts are under way to support the phased restart, with the company recently appointing a new mill manager and advertising for other key roles across the operation.

Ascot recently completed a C$61-million financing, which will help fund critical infrastructure upgrades. This includes the procurement of a 4 160 V transformer to boost power capacity at the PNL workings and the expansion of camp accommodations.

The new transformer, already on site, will enable multiple pieces of equipment to operate simultaneously - addressing current limitations caused by restricted power supply. Installation is in progress, with the additional power expected to come on line within days.

To support the growing workforce, Ascot has also ordered a 76-bed expansion for its camp. The first 38 beds have been installed, with the remaining beds scheduled for installation by June 2025.

With increased power and expanded camp capacity, Ascot expects its mining contractor, Procon Mining and Tunnelling, to ramp up productive operations as the company advances towards a full restart.

Edited by Creamer Media Reporter

Comments

Showroom

Flameblock
Flameblock

FlameBlock is a proudly South African company that engineers, manufactures and supplies fire intumescent and retardant products to the fire...

VISIT SHOWROOM 
M and J Mining
M and J Mining

M and J Mining are leading suppliers of physical support systems as used by the underground mining industry. Our selection of products are not...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Martin Creamer and Francisco Baudrand
Enaex Africa transforms beyond compliance
14th April 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.138 0.219s - 146pq - 2rq
Subscribe Now