https://newsletter.mw.creamermedia.com
Construction|Consulting|Design|Engineering|Exploration|Financial|Flow|Infrastructure|Mining|Power|PROJECT|Refinery|Roads|Waste|Water|Flow|Environmental|Infrastructure|Waste
Construction|Consulting|Design|Engineering|Exploration|Financial|Flow|Infrastructure|Mining|Power|PROJECT|Refinery|Roads|Waste|Water|Flow|Environmental|Infrastructure|Waste
construction|consulting-company|design|engineering|exploration|financial|flow-company|infrastructure|mining|power|project|refinery|roads|waste-company|water|flow-industry-term|environmental|infrastructure|waste

Baptiste nickel project, Canada – update

Periodic table symbol for nickel

27th September 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Baptiste nickel project.

Location
Decar Nickel District, British Columbia, Canada.

Project Owner/s
FPX Nickel Corp.

Project Description
A prefeasibility study has outlined an openpit mining project that will produce an average of 59 100 t/y of nickel in concentrate over a 29-year mine life.

The project will be developed in phases, with an initial mill throughput rate of 108 000 t/d (Phase 1), followed by an expansion to 162 000 t/d (Phase 2) funded from free cash flow after the initial after-tax payback period of 3.7 years.

All mine tailings and waste rock are proposed to be managed within one integrated facility that will use openpit prestripping material and waste rock for embankment construction.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an after-tax net present value, at an 8% discount rate, of $2.01-billion and an internal rate of return of 18.6% at $8.75/lb nickel, with a payback of 3.7 years.

Capital Expenditure
$2.18-billion.

Planned Start/End Date
Not stated.

Latest Developments
FPX Nickel has said that it will initiate a scoping study for a Canadian refinery with the capacity to produce 32 000 t/y of nickel in sulphate.

The scoping study will build on the results of a value engineering study for the Baptiste project and will incorporate the outcomes of an ongoing pilot-scale hydrometallurgical testwork programme, FPX said in a statement on September 17.

The scoping study is set for completion in the first quarter of 2025.

Key Contracts, Suppliers and Consultants
Ausenco Engineering Canada Inc (recovery methods, process plant, on-site infrastructure, capital cost estimate, operating cost estimate, financial model, opportunities, next steps, and refinery option); Carisbrooke Consulting Inc (off-site power); Equity Exploration Consultants (geology); ERM Consultants Canada (environmental, permitting studies); International Metallurgical & Environmental Inc (metallurgy); Knight Piésold (tailings, water management, and geotechnical); Next Mine Consulting (mineral resource estimate); Onsite Engineering (offsite roads and bridges); and TechSer Mining Consultants (mine design and mineral reserve estimate).

Contact Details for Project Information
FPX Nickel Corp, tel +1 604 681 8600 or email info@fpxnickel.com.

Edited by Creamer Media Reporter

Comments

 

Showroom

Actom image
Actom

Your one-stop global energy-solution partner

VISIT SHOWROOM 
M and J Mining
M and J Mining

M and J Mining are leading suppliers of physical support systems as used by the underground mining industry. Our selection of products are not...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Minerals Council South Africa CEO Mzila Mthenjane
Minerals Council optimistic about ongoing MPRDA review
13th December 2024 By: Marleny Arnoldi
Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.109 0.247s - 130pq - 2rq
Subscribe Now