Brook mine rare earths project, US

Name of the Project
Brook mine rare earths project.
Location
Wyoming, in the US.
Project Owner/s
Metallurgical coal producer Ramaco Resources.
Project Description
The project involves developing a rare earth elements (REE) processing facility at the Brook mine site. A preliminary economic assessment (PEA) published in July 2025 confirmed its technical and economic feasibility.
The project aims to produce up to 1 000 t/y of total rare-earth oxides (TREOs), along with scandium, gallium and germanium oxides, critical minerals essential to its economics over its 42-year design life.
Yearly mine throughput is estimated at 2.62-million tonnes. REEs are mostly found in carbonaceous claystones and shales above and below the coal seams.
Owing to the soft and friable host material, conventional surface mining is feasible. Metallurgical testwork shows high REE extraction rates, with all REEs over 90%, and other critical minerals in the mid-80% range using multistage leaching.
Potential Job Creation
The PEA does not state exact numbers for potential job creation.
Net Present Value/Internal Rate of Return
The unlevered pretax internal rate of return (IRR) is estimated at 38% under the base case scenario, with a payback of five years.
Capital Expenditure
$579.14-million. The estimated capital cost for the proposed processing facility is $533.1-million, excluding mine-related capital and residue placement.
Planned Start/End Date
Not stated.
Latest Developments
Project development is progressing, focusing on optimising reagent use, refining process design, and validating key assumptions through further technical and economic studies. An in-house metallurgical lab is being set up to improve turnaround time and data reliability.
Key Contracts, Suppliers and Consultants
Fluor Corporation (PEA) and Hazen Research Inc (metallurgical testing).
Contact Details for Project Information
Ramaco Resources, tel +1 859 244 7455 or email info@ramacometc.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation