Bunyu graphite project, Tanzania – update


Photo by Volt Resources
Name of the Project
Bunyu graphite project.
Location
Tanzania.
Project Owner/s
Critical minerals and advanced materials company Volt Resources.
Project Description
Bunyu is one of the biggest graphite deposits in the world, with a resource of 461-million tons at 4.9% total graphitic carbon for 22.6-million tons contained graphite. The project includes a proven reserve of 127-million tons at 4.4% total graphitic carbon.
The project will be developed in two stages.
An updated feasibility study on Stage 1 published in August 2023 proposes a mining and processing plant throughput rate of 400 000 t/y of ore to produce on average 24 780 t/y of graphite products over a 13.7-year mine life.
Volt intends to progress to Stage 2 to leverage the platform established by Stage 1, and Bunyu’s status as one of the biggest graphite resources globally, to dramatically scale production to 170 000 t/y and help meet the forecast global increase in demand for graphite products.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The updated PFS delivers a pretax net present value of $58.9-million and an internal rate of return of 31.5%, with a payback period of 2.9 years.
Capital Expenditure
The updated PFS has estimated a capital cost of $33.1-million, compared with the $31.8-million estimated in the 2018 PFS.
Planned Start/End Date
Not stated.
Latest Developments
Strategic partner negotiations are ongoing to progress Stage 1 to development. The talks centre on reducing capital and operating costs to ensure that the project can proceed economically in a subdued pricing environment for natural graphite.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Volt Resources, tel +61 8 9486 7788 or email info@voltresources.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation