Caldeira rare earths project, Brazil

IMAGE OF RARE EARTHS FROM THE CALDEIRA PROJECT

Photo by Meteoric Resources

17th October 2025

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Caldeira rare earths project.

Location
Minas Gerais, in Brazil.

Project Owner/s
Australian exploration company Meteoric Resources.

Project Description
Caldeira is the largest ionic clay resource in the world at 1.5-billion tonnes grading 2 359 parts per million (ppm) total rare-earth oxides (TREO), including 526 ppm magnetic rare-earth oxides and a high grade of more than 4 000 ppm TREO starter pit.

The Caldeira processing plant is designed to process six-million tonnes a year of dry feed to produce an estimated 24 000 t/y of dry mixed rare-earth carbonate product.

TREO production over the 20-year life-of-mine (LoM) is estimated at 271 687 t.

Average TREO production is estimated at 13 584 t/y, neodymium/praseodymium oxide production at 4 228 t/y (84 572 t over the LoM), and dysprosium/terbium oxide production of 130 t/y (2 600 t over the LoM).

Further, potential remains to expand the project and move downstream into the production of separated rare-earth element oxides at later dates.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at an 8% discount rate, of $1.98-billion and an internal rate of return of 31%, with a payback of 2.8 years using forecast pricing.

Capital Expenditure
Development capital is estimated at $443-million.

Planned Start/End Date
The project has received an accelerated path to permitting and production – to deliver first production in 2028 – with the Minas Gerais state government’s awarding priority status.

Latest Developments
Permitting is on track to allow for construction to start in 2026.

Key Contracts, Suppliers and Consultants
Not disclosed.

Contact Details for Project Information
Meteoric, tel +61 8 6166 9112.


 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Comments

Showroom

Flameblock
Flameblock

FlameBlock is a proudly South African company that engineers, manufactures and supplies fire intumescent and retardant products to the fire...

VISIT SHOWROOM 
Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

This week: Africa must collaborate to protect the planet; Engen showcases digital innovation, long-term commitment to coal sector at Coal Africa 2025 and, Pilot Crushtec demonstrates innovation, sustainability in crushing solutions at Coal Africa 2025
Resources Watch
22nd October 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.125 0.263s - 127pq - 2rq
Subscribe Now