https://newsletter.mw.creamermedia.com
Construction|Engineering|Mining|Packaging|PROJECT|Underground|Packaging
Construction|Engineering|Mining|Packaging|PROJECT|Underground|Packaging
construction|engineering|mining|packaging-company|project|underground|packaging

Dasa uranium project, Niger – update

Image of an excavator at work at the Dasa uranium project

14th October 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Dasa uranium project.

Location
Tim Mersoï basin, Niger.

Project Owner/s
Global Atomic Corporation.

Project Description
A 2021 feasibility study, focusing solely on Phase 1, has confirmed the Dasa project as economically compelling, even at $35/lb of uranium.

Phase 1 will have a 12-year mine schedule at a production throughput of 1 000 t/d to produce 45.4-million pounds of uranium.

The project has a maiden reserve of 4.1-million tonnes grading 5 267 parts per million for a total of 47.2-million pounds of uranium.

The project will use operationally proven uranium processing techniques comprising dry semiautogenous grinding and classification, pug-leaching and curing, a uranium extraction circuit (repulping and solid/liquid separation), a uranium purification and precipitation circuit, as well as drying and packaging.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an after-tax net present value, at an 8% discount rate, of $157-million and an internal rate of return of 22.7%, with a payback of five years.

Capital Expenditure
$208-million, including a 10% contingency.

Planned Start/End Date
Global Atomic broke ground on the Dasa project at the end of 2021 and aims to produce its first yellowcake for sale by January 2025.

Latest Developments
Global Atomic has received a letter of intent (LoI) from a second major North American utility for the procurement of 2.4-million pounds of uranium from the Dasa project.

The contract has a revenue potential of $140-million and will begin in 2025.

In June, a North American utility submitted an LoI for the procurement of 2.1-million pounds of uranium, with a revenue potential of $110-million.

Global Atomic recently entered the engineering, procurement and construction management phase at Dasa, where underground mining is set to begin in November.

Key Contracts, Suppliers and Consultants
CMAC-Thyssen Mining (collaring the portal and underground mine development).

Contact Details for Project Information
Global Atomic Corporation, tel +1 416368 3949 or email info@globalatomiccorp.com.

Edited by Creamer Media Reporter

Comments

 

Showroom

Aqs image
AQS Liquid Transfer

AxFlow AQS Liquid Transfer (Pty) Ltd is an Importer and Distributor of Pumps in Southern Africa

VISIT SHOWROOM 
Tractor & Grader Supplies
Tractor & Grader Supplies

Tractor & Grader Supplies (TGS™): Your Trusted, Genuine Source for New Replacement Parts for Earthmoving, Construction and Mining Machinery

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (14/03/2025)
14th March 2025 By: Martin Creamer
Magazine round up | 14 March 2025
Magazine round up | 14 March 2025
14th March 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.105 2.082s - 128pq - 2rq
Subscribe Now