Enchi gold project, Ghana


Name of the Project
Enchi gold project.
Location
Aowin district of Western Region, in south-west Ghana.
Project Owner/s
Newcore Gold.
Project Description
A preliminary economic assessment (PEA) has shown Enchi to be an economically robust, low-capital intensity, heap-leach project.
The project has an inferred mineral resource of 70.4-million tonnes grading 0.62 g/t, containing 1.4-million ounces of gold.
The updated PEA envisages an openpit, heap-leach operation, with a low strip ratio, using contract mining and processing 6.6-million tonnes a year and producing 983 296 oz over the 11-year mine life.
Mining will occur in a series of ten openpits across the Sewum, Boin, Nyam and Kwakyekrom deposits, with depth ranging from 20 m to 180 m.
The heap-leach facility will be built in three phases, with excess capacity available.
Infrastructure for the project includes mine dry facilities, equipment, a maintenance workshop, refuelling facilities, an explosives magazine, office administration facilities, an assay laboratory, and warehouse facilities.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 5% discount rate, of $333-million and an internal rate of return of 54% at a gold price of $1 650/oz, with a payback of 2.3 years.
Capital Expenditure
$97-million.
Planned Start/End Date
Construction is expected to take 15 months.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
BBA (PEA).
Contact Details for Project Information
Newcore Gold, tel + 1 604 484 4399 or email info@newcoregold.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation