https://newsletter.mw.creamermedia.com
Construction|Consulting|Consulting Engineers|Design|Electrical|Energy|Engineering|Infrastructure|Mining|Nuclear|Pipelines|Power|PROJECT|Projects|Resources|Road|Water|Solutions|Environmental|Infrastructure
Construction|Consulting|Consulting Engineers|Design|Electrical|Energy|Engineering|Infrastructure|Mining|Nuclear|Pipelines|Power|PROJECT|Projects|Resources|Road|Water|Solutions|Environmental|Infrastructure
construction|consulting-company|consulting-engineers|design|electrical|energy|engineering|infrastructure|mining|nuclear|pipelines|power|project|projects|resources|road|water|solutions|environmental|infrastructure

Etango-8 uranium project, Namibia – update

Location map of the Etango uranium project, in Namibia

Photo by Bannerman Resources

14th June 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Etango-8 uranium project.

Location
Erongo region, about 30 km east-south-east of Swakopmund, in Namibia.

Project Owner/s
Bannerman Energy, through its 95%-owned subsidiary Bannerman Mining Resources. The remaining 5% is owned by Namibian charitable body One Economy Foundation.

Project Description
The Etango deposit will be mined as a conventional truck-and-shovel openpit operation through contract mining over an initial mine life of 15 years.

Maximum mining rates are estimated at 27-million tonnes a year, with average ore mined of about 7.6-million tonnes a year at a life-of-mine average stripping ratio of 2.22.

Average production is estimated at 3.5-million pounds a year of uranium, enough to power up to eight large nuclear reactors.

Total production is estimated at 52.6-million pounds of uranium oxide.

Potential Job Creation
The project will create about 760 Namibian jobs and a multiplier effect of up to 5 000 indirect jobs.

Net Present Value/Internal Rate of Return
The project has an after-tax net present value, at an 8% discount rate, of $209-million and an internal rate of return of 17%, with a payback of 4.1 years.

Capital Expenditure
$353.5-million.

Planned Start/End Date
Not stated.

Latest Developments
Bannerman Resources has announced a moderate increase in the preproduction capital forecast for the Etango-8 project. 

This update follows the completion of the front-end engineering design (FEED) and control budget estimate (CBE) processes.

The completion of FEED and the processes has refined the outcomes of the 2022 definitive feasibility study (DFS), enhancing accuracy and recency to key cost estimates. As a result, the control budget estimate processes preproduction capital forecast has risen by $36-million, or 11.3%, from the DFS estimate, to $353.5-million. The increase is driven by design changes and impacts of inflation.

“The FEED work has confirmed the high quality of the technical evaluation and design, as detailed in the December 2022 DFS,” CEO Gavin Chamberlain has said.

Finalising the CBE demonstrates the robustness of the DFS cost estimates, evidenced by the lack of significant increases in forecast construction or operating costs, he adds.

The moderate increase in forecast preproduction capital is attributed to design enhancements that deliver cost efficiencies and reduce operating risks.

The CBE continues to apply the total DFS contingency of $27.3-million.

Early-works construction of the access road and water pipelines is under way and is expected to be completed in July.  

The company is continuing with strategic finance and offtake marketing workstreams.

Key Contracts, Suppliers and Consultants
Wood plc (study lead – process plant design and related infrastructure, plant capital and operating cost estimates); Qubeka Mining Consultants (geology review, mining reserve estimate, mine planning and mining cost estimates); Snowden Optiro (mineral resource estimate); Creo Engineering Solutions (engineering support for Bannerman owner’s team); MineTechnics (openpit geotechnical parameters); Lund Consulting Engineers (water supply infrastructure); Addiza Energy Solutions (external electrical supply infrastructure); A.Speiser Environmental Consultants (environmental impact assessments); Namisun Environmental Projects & Developments (conceptual mine closure plan).

Contact Details for Project Information
Bannerman Energy, tel +61 8 9381 1436 or email info@bmnenergy.com.
 

Edited by Creamer Media Reporter

Comments

 

Showroom

BOVA Safety Wear
BOVA Safety Wear

BOVA cemented their reputation in Africa by delivering high quality engineering through their range of safety footwear. 21 years after producing...

VISIT SHOWROOM 
John Thompson
John Thompson

John Thompson, the leader in energy and environmental solutions through value engineering and innovation, provides the following: design, engineer,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Minerals Council South Africa CEO Mzila Mthenjane
Minerals Council optimistic about ongoing MPRDA review
13th December 2024 By: Marleny Arnoldi
Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.105 0.241s - 130pq - 2rq
Subscribe Now