https://newsletter.mw.creamermedia.com
Africa|Botswana|Construction|Consulting|Design|Engineering|PROJECT|Resources|srk|SRK Consulting|Testing
Africa|Botswana|Construction|Consulting|Design|Engineering|PROJECT|Resources|srk|SRK Consulting|Testing
africa|botswana|construction|consulting-company|design|engineering|project|resources|srk|srk-consulting|testing

K. Hill manganese project, Botswana – update

Manganese ore from the K.Hill project

12th November 2021

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
K. Hill manganese project.

Location
The Kanye basin, in south-eastern Botswana.

Project Owner/s
Giyani Metals Corp.

Project Description
The project is expected to produce 891 000 t of high-purity manganese sulphate monohydrate over its ten-year mine life.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The updated preliminary economic assessment (PEA) has increased the project’s pretax net present value, at a 10% discount rate, from $357-million in the April 2020 PEA to $431-million in the April 2021 PEA. The internal rate of return has decreased from 82.10% to 80% after tax. The project has a payback of three years.

Capital Expenditure
The project will require a capital investment of about $153-million.

Planned Start/End Date
Not stated.

Latest Developments
Giyani Metals Corporation has, through Mintek, in South Africa, completed enhanced metallurgical testwork and final process flowsheet design as part of its feasibility study on the K.Hill manganese oxide project.

However, because this phase of testwork does not include crystallisation, a specialist engineering firm has been engaged to undertake crystallisation testwork to finalise the process flowsheet for the feasibility study and the demonstration plant.

Once the process flowsheet is finalised, Giyani will contract an engineering firm for the construction of the demonstration plant.

Following a peer review of the process flowsheet, Giyani anticipates that the design-build contract for the demonstration plant will be signed with the objective for the plant to be operational in the first half of 2022.

Giyani CEO Robin Birchall has said that the demonstration plant will produce about 250 kg/d of final high-purity manganese sulphate monohydrate product to share with potential customers for preliminary product testing, and that “we are already assembling interested parties”.

Key Contracts, Suppliers and Consultants
Mintek (metallurgical testwork) and SRK Consulting ((updated mineral resources estimate).

Contact Details for Project Information
Giyani Metals Corp, tel +128 9291 4032 or email info@giyanimetals.com.

Edited by Creamer Media Reporter

Comments

 

Showroom

Goodwin Submersible Pumps Africa (Pty) Ltd
Goodwin Submersible Pumps Africa (Pty) Ltd

Goodwin Submersible Pumps Africa is sole distributors for Goodwin electrically driven, submersible, abrasion resistance slurry pumps.

VISIT SHOWROOM 
GreaseMax
GreaseMax

GreaseMax is a chemically operated automatic lubricator.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Minerals Council South Africa CEO Mzila Mthenjane
Minerals Council optimistic about ongoing MPRDA review
13th December 2024 By: Marleny Arnoldi
Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.343 0.497s - 127pq - 2rq
Subscribe Now