K. Hill manganese project, Botswana – update
Name of the Project
K. Hill manganese project.
Location
The Kanye basin, in south-eastern Botswana.
Project Owner/s
Giyani Metals Corp.
Project Description
The project is expected to produce 891 000 t of high-purity manganese sulphate monohydrate over its ten-year mine life.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The updated preliminary economic assessment (PEA) has increased the project’s pretax net present value, at a 10% discount rate, from $357-million in the April 2020 PEA to $431-million in the April 2021 PEA. The internal rate of return has decreased from 82.10% to 80% after tax. The project has a payback of three years.
Capital Expenditure
The project will require a capital investment of about $153-million.
Planned Start/End Date
Not stated.
Latest Developments
Giyani Metals Corporation has, through Mintek, in South Africa, completed enhanced metallurgical testwork and final process flowsheet design as part of its feasibility study on the K.Hill manganese oxide project.
However, because this phase of testwork does not include crystallisation, a specialist engineering firm has been engaged to undertake crystallisation testwork to finalise the process flowsheet for the feasibility study and the demonstration plant.
Once the process flowsheet is finalised, Giyani will contract an engineering firm for the construction of the demonstration plant.
Following a peer review of the process flowsheet, Giyani anticipates that the design-build contract for the demonstration plant will be signed with the objective for the plant to be operational in the first half of 2022.
Giyani CEO Robin Birchall has said that the demonstration plant will produce about 250 kg/d of final high-purity manganese sulphate monohydrate product to share with potential customers for preliminary product testing, and that “we are already assembling interested parties”.
Key Contracts, Suppliers and Consultants
Mintek (metallurgical testwork) and SRK Consulting ((updated mineral resources estimate).
Contact Details for Project Information
Giyani Metals Corp, tel +128 9291 4032 or email info@giyanimetals.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation