https://newsletter.mw.creamermedia.com
Africa|Construction|Consulting|Crushing|flotation|Mineral Processing|Mining|PROJECT|Resources|Road|Screen|Trucks|Drilling
Africa|Construction|Consulting|Crushing|flotation|Mineral Processing|Mining|PROJECT|Resources|Road|Screen|Trucks|Drilling
africa|construction|consulting-company|crushing|flotation|mineral-processing|mining|project|resources|road|screen|trucks|drilling

Kanyika niobium project, Malawi

Image of reverse circulation drilling at the Kanyika mine

Photo by Global Metals & Mining

29th October 2021

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Kanyika niobium project.

Location
Central Malawi.

Project Owner/s
Globe Metals & Mining.

Project Description
Kanyika is positioned to be the first niobium mine in Africa and the first new producer in 50 years.

The project will have a life-of-mine (LoM) of about 23 years, with the capability to extend this to 38 years, subject to the conversion of inferred resources through further drilling.

Mining will involve conventional openpit methods comprising drill-and-blast, followed by loading and hauling using 70 t shovels and 40 t off-road articulated haul trucks.

Mineral processing will involve comminution at 1.5-million tonnes a year. This will involve crushing, followed by semiautogenous grinding and ball milling in a closed circuit with Derrick screen classifiers. Concentration involves magnetic separation, flotation beneficiation and gravity separation to produce (niobium/tantalum) pyrochlore mineral concentrate.

The mine will produce about 260 000 t of niobium and tantalum concentrate over the LoM and on average about 11300 t/y.

Potential Job Creation
The project is expected to employ and train thousands of local staff over the LoM, and through envisaged community programmes.

Net Present Value/Internal Rate of Return
The project has a net present value, at an 8% discount rate, of $1-billion and an internal rate of return of about 50%, with a payback of about
1.5 years from first production.

Capital Expenditure
Preproduction capital costs are estimated at $250-million.

Planned Start/End Date
The project will take 24 months to complete.

Latest Developments
All approvals are in place to start construction immediately upon funding and relocation of affected persons.

Key Contracts, Suppliers and Consultants
Wood, Orelogy Mine Consulting and Globe Metals & Mining (operating costs).

Contact Details for Project Information
Globe Metals & Mining, tel +61 6118 7240 or email info@globemm.com.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

SABAT
SABAT

From batteries for boats and jet skis, to batteries for cars and quad bikes, SABAT Batteries has positioned itself as the lifestyle battery of...

VISIT SHOWROOM 
GreaseMax
GreaseMax

GreaseMax is a chemically operated automatic lubricator.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer
Magazine round up | 15 November 2024
Magazine round up | 15 November 2024
15th November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:2.978 3.128s - 128pq - 2rq
Subscribe Now