Lithium Americas raises reserve estimate for Thacker Pass, appoints new CFO
Canada's Lithium Americas said on Tuesday it has raised the reserve estimate for the Thacker Pass lithium project and also appointed industry veteran Luke Colton as the new CFO, effective January 29.
The company's US-listed shares were up 2.4% at $3.49 in premarket trade.
The Thacker Pass project is slated to open later this decade and be a key supplier to General Motors, which last year contributed $625-million to buy a 38% stake in their new joint venture, Lithium Nevada Ventures, for developing the project.
U.S. automakers are ramping up their output of EVs and hybrids and aiming to reduce their reliance on China for battery-related materials in a competitive market.
The mine's first phase is expected to be completed in late 2027, and produce 40 000 metric tons of battery-quality lithium carbonate per year, enough for up to 800 000 EVs.
The company now expects mineral reserve estimate of 14.3-million tonnes (Mt) lithium carbonate equivalent (LCE), an increase of 286% and mineral resource estimate of 44.5 Mt LCE, an increase of 177% since the November 2022 Feasibility Study.
"Thacker Pass is now the largest measured lithium reserve and resource in the world" said CEO Jonathan Evans.
The lithium miner said it expects the new estimates to support an expansion of up to five phases with an 85-year mine life.
Last year, the US Department of Energy finalised a $2.26-billion loan for Lithium Americas to build the Nevada mine.
The Canadian firm said on Monday, Colton will replace interim CFO April Hashimoto, who will resume her role as the company's senior VP, Finance and Administration.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation