MSA to update Deep-South’s Haib project mineral resource estimate
The mineral resource estimate and subsequent technical report will follow the completion of the drilling program that was stopped in June 2021
Mineral exploration and development company Deep-South Resources has reappointed South African technical consultancy the MSA Group to produce an updated National Instrument (NI) 43-101-compliant mineral resource estimate (MRE) for the company’s 100%-owned Haib copper project, in Namibia.
The mandate of MSA includes site visits to verify data collection, quality assurance and controls, develop a structural geological model in collaboration with Deep-South’s geological team, assess the presence of domains and model these domains in three dimensions, complete a geostatistical study for each domain and issue an updated NI 43-101 MRE.
The mandate of MSA was previously interrupted when the Namibia Ministry of Mines refused to approve the renewal of the Haib copper licence in 2021. However, after a long court battle, the Ministry earlier this year renewed the licence.
The new MRE and subsequent technical report will follow the completion of a drilling programme that was stopped in June 2021.
There are still 5 200 m of drilling to be completed.
"We are pleased to have re-engaged MSA. Their vast experience will help to enhance an already robust project and unlock further value while reducing risk for our shareholders. With the backdrop of a strong copper price, we are highly optimistic for the coming years that Haib will garner additional interest from investors and other interested parties,” states Deep-South president and CEO Pierre Leveille.
MSA has already started reviewing the historical drilling data in order to specify the additional drilling needed to produce the MRE.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation